Public lavatory (restroom) faucet water sense?
CI-v4 WEp1:Indoor water use reductionposted by Carlos Dobobuto on
Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.
PIf2 Site Characteristics for individual building project on a LEED Campus
Schools-2009 PIf2:Project Summary Detailsposted by Yasha Ogg on
I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?
Trellis in Vegetated Area
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Summer on
I'm working on a project with an open space and vegetated area compliant to the credit requirement.
Are Shades 'Furniture and Furnishings'?
CI-v4 EQc2:Low emitting materialsposted by Julie Hendricks on
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?
Update information for previously awarded credits
posted by Silvia Ruiz on
Our project got back the Final Design Review, but changes that affect one Awarded credit occurred during construction.
NAF Composites Not CARB
NC-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
There are particleboard products that are NAF with third party certifications that LEED reviewers will not accept because they do not have a CARB exempt executive order.
Demand Response Plan - who creates the plan?
NC-v4 EAc4:Demand responseposted by Deborah Lucking on
We have a mechanical engineer, an electrical engineer, a commissioning agent, and an energy modeler. Looking for advice on who is the appropriate author of such a plan.