Forum quick links
PV installation built and commissioned prior to Occupancy
CI-v4 EAc4:Renewable energy productionposted by Gary Shlifer on
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.
Multi Scene Control for Lighting
NC-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We're working on a LEED v4 NC project in Mexico.
Greywater systems and copper piping
posted by Patty Karapinar on
Hi, I've been following the copper piping discussion and am wondering if copper piping has been a problem in greywater systems. We've used Aquatherm to some extent
Table 2 minimum compliance threshold
Schools-NC-v4 WEc2:Indoor water use reductionposted by Bryna Dunn on
I'm curious about whether other teams have had success with meeting the requirements of Table 2 in terms of the minimum amount of laundry that must be done per year to qualify for the point.
Potable Water Piping: Plastic (Polypropylene) or Copper?
posted by Martine Dion on
Hello all,
Could any of you point me out to recent studies showing the health impacts of plastic piping vs. copper piping?
LEED administrative consultant to assist commercial builder in Wash DC?
posted by Harry Flamm on
We are working on a large, commercial, LEED project in the Wash DC area, and the Construction Management firm needs LEED administrative/documentation assistance on their end of the pr
Master Site / Campus Innovation Credits
NC-v4 INc1:Innovationposted by Adam Fitzpatrick on
Can Innovation and/or Regional Priority credits be included in a campus master site submission? Or must these credits be awarded at the project level?