Forum quick links
Pilot Credit Requirment
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Maria Fiorelli on
I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation.
Upcoming Call
posted by Jennifer Zakrzewski on
Hello everyone,
Here's a reminder that our next monthly call will be taking place next Tuesday, September 10th at 2:00pm EST.
Alternative methods of documenting an executed tenant lease agreement?
CS-v4 EAc3:Advanced energy meteringposted by Allan Robles on
Hi there LEEDuser-verse,
Indoor Water Use Reduction and Water Sense
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
On pg. 297 of the LEED v4 BD&C Reference Guide it states the general credit requirements but makes no mention of WaterSense labels being required there. However on pg.
Sound Transmission - Open Office Adjacency
CI-v4.1 EQc9:Acoustic Performanceposted by Tyler Cottrell on
How are Open Plan Office areas classified in terms of the Sound Transmission section?
Water discharge into Municipal STP
EBOM-v4.1 WEc1:Water Performanceposted by Kumar Biplab on
Background:- The building is part of a planned township and the township is maintained by municipality. Municipality also supplies potable water to the building through metered connection.
Plywood Blocking
CI-v4.1 EQc2:Low Emitting Materialsposted by Allen Cornett on
Is plywood blocking in the wall part of the Wall Panel category or the Composite Wood category? It is not specifically address or excluded in the Wall Panel category, and I could ma
How to measure the vegetated area?
NC-v4 SSc3:Open spaceposted by Summer on
I'm confused of how the vegetation/plants will be measured.
CLT experience
posted by Kate Bubriski on
We are embarking on our first CLT projects (our at least we hope that they go that way).