Topic

Water metering for Fire safety

Retail-NC-v4 WEc4: Water metering
posted by ilenia ottati on Jul 3, 2017, 6:38 am

Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility. Do you think that metering that kind...

Last reply: Tristan Roberts, Jul 11, 2017, 12:22 pm

UNITS FOR SIMULTANEOUS&INDEPENDENT PRODUCTION OF HOT&COLD Water

CS-v4 EAp2: Minimum Energy Performance
posted by Giuseppina Amorusi on Jun 30, 2017, 5:39 am

Marcus Sheffer LEED Fellow, 7group / Energy Opportunities LEEDuser Expert 5524 thumbs up June 30, 2017- 9:57 am This is probably not the best place to ask software specific questions about how to model something. You can try BLDG-SIM at onebuilding.org or some of the other discussion forums or the Energy Plus help desk. If the software can't model your system directly then you would need to employ a work around. If you do so for LEED you must follow the exceptional calculation method and ideally base your work around on something that has been published. Often manufacturers of equipment...

Last reply: Marcus Sheffer, Jun 30, 2017, 9:57 am

EAP2_Humidification Modeling

CS-v4 EAp2: Minimum Energy Performance
posted by Giuseppina Amorusi on Jun 30, 2017, 3:55 am

Hi all,
I need to model water humidification section of air handling unit.
The software I was using is Design Builder + Energy Plus, that don't have the possibility to insert a water...

Last reply: Marcus Sheffer, Jun 30, 2017, 9:53 am

Airport building

:
posted by alessandro santuari on Jun 29, 2017, 5:46 am

Our project refers to an addiction and renovation to an existing airport terminal (only building and a limited outdoor area).
As requested by the footnote can we consider only traffic...

mandatory for air leakage in Europe

NC-v4 EAp2: Minimum Energy Performance
posted by Francesco Passerini on Jun 7, 2017, 1:18 pm

How can you demonstrate the compliance with the mandatory provisions relative to air leakage of the envelope (both walls and fenestrations) of ASHRAE 90.1-2010 (par. 5.4.3.1.2, 5.4.3.1.3, 5.4.3.2...

Last reply: Jean Marais, Jun 9, 2017, 10:40 am

Acoustic performance: reverberation time

NC-v4 EQc9: Acoustic performance
posted by alessandro santuari on Jun 1, 2017, 9:28 am

Hi, we have a project with large waiting rooms: are there specific values for "...

EA Credit 2

NC-2009 EAc2: On-Site Renewable Energy
posted by Cristina Parenti on May 26, 2017, 5:52 am

Hello,
we are working on a project that intended to install solar panels on the roof but there isn't much room left for them.. The owner has several solar panel fields in the region (more...

Last reply: Marcus Sheffer, May 26, 2017, 10:53 am

mandatory provisions for systems that are not in scope of work

CS-v4 EAp2: Minimum Energy Performance
posted by Alessandro Speccher on May 17, 2017, 1:13 pm

hi all,
we are doing a feasibility study on a CS major renovation project located in South Italy. HVAC (that was substituted 7 years ago) and envelope (that do not need to be upgraded)...

Last reply: Alessandro Speccher, May 18, 2017, 10:44 am

Integrative Process-Simple box C&S v4

CS-v4 IPc1: Integrative process
posted by Giuseppina Amorusi on May 11, 2017, 4:40 am

Hi all,
I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification.
We have an existing building...

Last reply: Marcus Sheffer, May 11, 2017, 9:08 am

Existing Equipment

NC-v4 EAp2: Minimum Energy Performance
posted by Francesco Passerini on May 9, 2017, 10:15 am

The 90.1-2010 User's Manual states:
"In some cases, a complete HVAC system already exists (...) the proposed building and baseline building models are the same and are based on the existing...