View Type 3 with Permanent Obstruction Near Ceiling
NC-v4 EQc8:Quality viewsposted by Laura Heagler on
We have some spaces with vision glazing 12' and 16' head height. The spaces have exposed spiral ductwork.
Existing Building Demolition
CS-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Narguess Kh on
I am working on a project which will be built on existing site. Results of site assessment shows presence of asbestos and soil pollutions.
"Fixed Spray irrigation only permitted on Turfgrass"
NC-v4 WEp1:Outdoor water use reductionposted by Green Projects on
When the Watersense Water Budget Tool is completed with 'fixed spray' selected as irrigation type for trees and shrubs, it produces a warning in red text that says, "Fixed Spray irrigation onl
View type 3. Unobstructed views located within the distance of three times the head height of the vision glazing
NC-v4 EQc8:Quality viewsposted by Keith Robertson on
I find the Reference Guide explanation unclear. Page 749 includes a diagram of a compliant open office space and non-compliant open office space.
Commissioning Fees
NC-v4 EAc1:Enhanced commissioningposted by Tom Grassi on
I am looking for updated studies with cost data for LEED v4 Commissioning services, including Enhanced, Envelope and Monitoring-Based Commissioning. "The Cost of LEED v4" is a good publicatio
trees shading calculation
NC-v4 SSc5:Heat island reductionposted by Loic Angot on
Project Location : Canada, Ontario
Hi,
A question about shading calculation for heat island credit, non-roof measures.
Heat Island reduction provided by the building itsself
NC-v4 SSc5:Heat island reductionposted by Carmen Mielecke on
Dear All, if a Project consists of many small courtyyards and shade for those courtyyards is provided by the building structure itsself, Can this in any way be used to contribute to the fulfillment
LEED Online Credits not eligible in Innovation in Design Only
NC-v4 RPc1:Regional priorityposted by Katie Vasbinder on
On LEED online the Regional Priority Credits show we are eligible within a
credit threshold (ie. Optimize Energy Performance) but in the Innovation