Lighting Levels in Commercial Kitchens

NC-v4 EQc6:Interior lighting
posted by  Greg Romanczyk  on 

Is there an exclusion for commercial kitchens needing to meet the EQc6 mutli-occupant lighting levels?  We are working on a hotel project, with a restaurant, where the kitchen has switches but

3
Default Avatar
SOLID GREEN CONSULTING CC
LEEDuser Premium Member
0 thumbs up
Tue Sep 28, 2021, 5:31 pm

Demolition of existing building

NC-v4 MRc5:Construction and demolition waste management
posted by  Erik Heck  on 

We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations?

4
Perkins Eastman
LEEDuser Premium Member
0 thumbs up
Mon Sep 27, 2021, 9:19 pm

Amenities space

CI-v4 WEc1:Indoor water use reduction
posted by  Allen Cornett  on 

I am working on a project that is a renovation and expansion of the amenity spaces in an existing office building.  The amenity spaces consist of a café with dining area, tenant lounge, m

3
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Mon Sep 27, 2021, 6:41 pm

CDPH v1.2 vs. 1.1 and Exposure Scenarios for Compliance

CI-v4 EQc2:Low emitting materials
posted by  Patty Lloyd  on 

I received LEED review comments for a commercial office space that the said "adhesive product Greenguard Gold certificate indicates the Classroom Exposure Scenario was used to determine compli

5
Sr. Sustainability Manager
Hensel Phelps
LEEDuser Basic Member
10 thumbs up
Mon Sep 27, 2021, 5:41 pm

The Wild West of Solar

Green Commons
posted by  John Mlade  on 

Hello friends,

6
Director of Sustainability
ICON architecture, inc.
LEEDuser Basic Member
0 thumbs up
Mon Sep 27, 2021, 1:03 pm

Walkable Project Site - Entrance Locations & Primary Facade

NC-v4 INc1:Innovation
posted by  Levi Jimenez  on 

The LEED Innovation Catalogue for Walkable Project Site requires that item #2, "A main entrance on the primary façade faces a public space such as a street , square, park, paseo, or plaza, but

2
Mon Sep 27, 2021, 7:09 am
3
Senior Mechanical Engineer
Mead & Hunt
LEEDuser Premium Member
0 thumbs up
Mon Sep 27, 2021, 7:00 am

Option 1: 2% or 5%, Option 2: 6% or 10%?

NC-v4.1 LTc8:Electric Vehicles
posted by  Timothy Ian Middleton  on 

Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%.

6
Mon Sep 27, 2021, 6:56 am

Documenting Construction Credits for Individula registered projects within Master Site...

LEED Guidance for Campuses and Multiple Buildings
posted by  Rick Alfandre  on 

We are working on a project with a Master Site and 2 registered projects on the site.    For Construction Credits such as Mr 4 Recycled Content our budget is for the overall project,

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Sat Sep 25, 2021, 12:43 pm