Lighting Levels in Commercial Kitchens
NC-v4 EQc6:Interior lightingposted by Greg Romanczyk on
Is there an exclusion for commercial kitchens needing to meet the EQc6 mutli-occupant lighting levels? We are working on a hotel project, with a restaurant, where the kitchen has switches but
Demolition of existing building
NC-v4 MRc5:Construction and demolition waste managementposted by Erik Heck on
We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations?
Amenities space
CI-v4 WEc1:Indoor water use reductionposted by Allen Cornett on
I am working on a project that is a renovation and expansion of the amenity spaces in an existing office building. The amenity spaces consist of a café with dining area, tenant lounge, m
CDPH v1.2 vs. 1.1 and Exposure Scenarios for Compliance
CI-v4 EQc2:Low emitting materialsposted by Patty Lloyd on
I received LEED review comments for a commercial office space that the said "adhesive product Greenguard Gold certificate indicates the Classroom Exposure Scenario was used to determine compli
Walkable Project Site - Entrance Locations & Primary Facade
NC-v4 INc1:Innovationposted by Levi Jimenez on
The LEED Innovation Catalogue for Walkable Project Site requires that item #2, "A main entrance on the primary façade faces a public space such as a street , square, park, paseo, or plaza, but
When did tankless toilets became eligible for water sense labeling?
NC-v4 WEp2:Indoor water use reductionposted by Shana Scheiber on
Hello,
Option 1: 2% or 5%, Option 2: 6% or 10%?
NC-v4.1 LTc8:Electric Vehiclesposted by Timothy Ian Middleton on
Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%.
Documenting Construction Credits for Individula registered projects within Master Site...
posted by Rick Alfandre on
We are working on a project with a Master Site and 2 registered projects on the site. For Construction Credits such as Mr 4 Recycled Content our budget is for the overall project,