LEED ND with Buildings Under Construction

General forums
posted by  Philippa Cameron  on 

If a site has a number of buildings already under construction and substantially complete, the design for most of which does not consider LEED requirements, and the client decides to pursue LEED ND

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Mar 17, 2015, 6:20 am

Energy Modelling Issues

NC-2009 EAp2:Minimum Energy Performance
posted by  Cynthia Estrada  on 

I am project admin for a V3-2009 NC project and wondered if anyone had issues with energy modeling software and accuracy of results with complicated/unique systems?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 16, 2015, 6:13 pm

Addition to existing building

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Kasandra Martin  on 

We are building an addition to an existing non-LEED building and only adding a wall in the existing building. Originally we were going for LEED v2009 NC and now switched to EBOM.

3
Mon Mar 16, 2015, 4:50 pm

seashells considered recycled content?

CI-2009 MRc4:Recycled Content
posted by  Dan Governile  on 

Can anyone tell me if seashells can be a recycled content in the manufacture of cement terrazzo countertops?

8
Default Avatar
LEEDuser Expert
472 thumbs up
Sat Mar 14, 2015, 12:33 am

Rated Cooling Capacity for Commercial Refrigeration Equipment

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Wei Jiang  on 

We have a project that has many commercial refrigeration equipment such as walk-in coolers and feezers in commercial kitchens.

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Fri Mar 13, 2015, 5:23 pm

BREEAM as the certification scheme

ND-v2009 GIBp1:Certified green building
posted by  Tanja Arnesson  on 

Hi, We are looking into a LEED ND project where we are having problems with applying LEED NC for a shopping centre since the building is attached to two others building.

9
onwer and principal
ecocentric (pty) ltd.
LEEDuser Basic Member
84 thumbs up
Fri Mar 13, 2015, 4:07 pm

Re-submission for Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Madhura Dhayagude  on 

We are currently working on a project that had submitted documentation for Design review.We were not on board then. After the review, the project went on a hold for a period of almost 3 years.

3
Thu Mar 12, 2015, 6:46 pm

Ancillary site buildings

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erin Holdenried  on 

Are unoccupied ancillary site buildings included in the credit? Or SSc7.2? Thanks for your feedback!

3
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu Mar 12, 2015, 3:49 pm

Basic Services Provided by the Client

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Keerthi Ratnayake  on 

We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers.

3
Thu Mar 12, 2015, 3:06 pm

New credit after the preliminary combined review process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stella Stella  on 

Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?

4
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2015, 1:34 am