LEED ND with Buildings Under Construction
posted by Philippa Cameron on
If a site has a number of buildings already under construction and substantially complete, the design for most of which does not consider LEED requirements, and the client decides to pursue LEED ND
Energy Modelling Issues
NC-2009 EAp2:Minimum Energy Performanceposted by Cynthia Estrada on
I am project admin for a V3-2009 NC project and wondered if anyone had issues with energy modeling software and accuracy of results with complicated/unique systems?
Addition to existing building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kasandra Martin on
We are building an addition to an existing non-LEED building and only adding a wall in the existing building. Originally we were going for LEED v2009 NC and now switched to EBOM.
seashells considered recycled content?
CI-2009 MRc4:Recycled Contentposted by Dan Governile on
Can anyone tell me if seashells can be a recycled content in the manufacture of cement terrazzo countertops?
Rated Cooling Capacity for Commercial Refrigeration Equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Wei Jiang on
We have a project that has many commercial refrigeration equipment such as walk-in coolers and feezers in commercial kitchens.
BREEAM as the certification scheme
ND-v2009 GIBp1:Certified green buildingposted by Tanja Arnesson on
Hi, We are looking into a LEED ND project where we are having problems with applying LEED NC for a shopping centre since the building is attached to two others building.
Re-submission for Design Review
posted by Madhura Dhayagude on
We are currently working on a project that had submitted documentation for Design review.We were not on board then. After the review, the project went on a hold for a period of almost 3 years.
Ancillary site buildings
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Are unoccupied ancillary site buildings included in the credit? Or SSc7.2? Thanks for your feedback!
Basic Services Provided by the Client
NC-2009 SSc2:Development Density and Community Connectivityposted by Keerthi Ratnayake on
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers.
New credit after the preliminary combined review process
posted by Stella Stella on
Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?