Forum quick links
Primers - really?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Keith Robertson on
In my opinion, LEED 2009 incorrectly categorizes primers. I know that the table issued with the 4/14/10 addendum clearly lumps primers into the GS-11 requirements. This I don’t understand.
Baseline landscape type
EBOM-2009 WEc3:Water Efficient Landscapingposted by Charalampos Giannikopoulos on
For a project where turf grass area is replaced by native low-irrigation demanding planting would baseline landscape type include turf whereas design type include the new water efficient species?
preconsumer recycled content in steel
NC-2009 MRc4:Recycled Contentposted by Osama Hassan on
How steel industries produce a waste that considered as a pre-consumer?
If the ventilation of kitchens in hotel should be included in
NC-2009 IEQp1:Minimum IAQ Performanceposted by Leanne Niu on
A hotel project that the kitchens have independent ventilation and outdoor air system , whether the ventilation of kitchens should be included in the calculation?
VOC content for Shop applied finishes
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jeremy Mendenhall on
We are new to the Leed program and wanting to make sure that we are following all of the guidelines, we have received some instruction however I'm trying to get confirmation that shop applied fini
Commingled Waste Diversion
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Michelle Rosenberger on
I see nothing in this credit that discusses commingled diversion methodologies or requires monthly diversion rate backup from facilities like the NC rating system.
Floor Coating that Exceeds VOC Limit
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Amanda Atkinson on
We have two CS v2009 projects in which a single epoxy floor coating exceeds the allowed VOC content. All other flooring products and coatings are compliant.
Uploads and deleting uploads - is the webinar posted somewhere?
posted by Susan Di Giulio on
I watched the webinar on how to use the new site on January 5, and I have been to the uploads page for the project in question but I can't remember how to upload docs and how to delete previously u
What if only 2 of 3 stairwells meet daylighting requirement?
Pilot-Credits EQpc78:Design for active occupantsposted by Steve Loppnow on
In a multi-family project, we have 2 of 3 stairwells that meet the daylighting requirement. Would we still be able to claim credit for the daylighting option, as 1 of our 7 features?
Option 2 for submetered irrigation
EBOM-v4 WEc1:Outdoor water use reductionposted by Charalampos Giannikopoulos on
If we install subsystem metering for the irrigation systems to comply with WE credit Water Metering can we still select Option 2 (No irrigation meter installed: Calculated water budget).