Corporate Policy Question

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  David Wood  on 

We have a corporate Sustainable purchasing policy. With the policy came this note:

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Apr 26, 2016, 7:01 pm

ISO 50001 ACP Timeframe

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Gina Dederer  on 

Our project has completed a full ISO 50001 certification last year and is not due for a renewal until 2018.

3
Default Avatar
URS Deutschland GmbH
LEEDuser Basic Member
3 thumbs up
Tue Apr 26, 2016, 12:40 pm

District Energy System Guidance, Option 1

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Hello, I am modeling a district cooling system, since the HVAC system serves three buildings, including the one that is seeking LEED Certification.

3
Tue Apr 26, 2016, 12:17 pm

Calculation based on chilled water meters

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Maria Isabel Conde  on 

Our comercial interior project is located in a building that has photovoltaic panels that feed the central chilled water plant. We have: 1.

5
Tue Apr 26, 2016, 12:00 am

Additional floors of existing building

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1.

8
Default Avatar
ME Engineers Inc.
LEEDuser Basic Member
17 thumbs up
Mon Apr 25, 2016, 8:44 pm

Performance period and construction

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Kasandra Martin  on 

Our project is in the process of building an addition. The performance period is not yet started.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Apr 25, 2016, 8:41 pm

Exemplary Performance?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

DES Condenser Water System

NC-2009 EAp2:Minimum Energy Performance
posted by  Jake Torok  on 

We're working on a small project (7,500 SF) pursuing LEED NC v2009 designed with water-source VRFs served by a shared central condenser water system with cooling towers, boilers, and pumping.

4
Mon Apr 25, 2016, 4:39 pm

Implementing all improvements in one renovations phase at a time

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Melissa Merryweather  on 

We're starting the audits for an EBOM project that is a university building.

3
Mon Apr 25, 2016, 4:17 pm