Forum quick links
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?
Wood Framed Attic and Roof
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Paul Silverberg on
Our project was the complete renovation of a small building with masonry exterior walls, a concrete slab on grade at the first floor and wood framing for the interior walls, 2nd floor, attic and ro
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Fire Suppression water count as a candidate for Submetering?
CS-v4 WEc4:Water meteringposted by Jennifer Turchin on
Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?
Option 3 Strategy '4'
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?
Private shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Hanh Truong on
Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b
CI clarification
CI-2009 MPR1:Must comply with environmental lawsposted by Hariraman R on
If i want to Certify a portion of a building ?? shall i go for LEED CI ??
air-side economizer, how to input in calculator
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Royal on
Our project is a one floor (on the 30th) LEED-CI project gut renovation project.
List of meters
NC-v4 EAc3:Advanced energy meteringposted by Vasileios Kalfountzos on
Hello all, our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter.
Double- Counting of Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Bharath Ravuru on
Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?