PV in construction phase

CS-2009 EAc2: On-Site Renewable Energy
posted by Emmanuel Pauwels on Jul 27, 2012, 7:16 am

We have filed for design submittal and are moving into construction phase. The client decided to integrate PVs in the project. Will it be possible to apply for this credit in the construction...

Last reply: Marcus Sheffer, Jul 27, 2012, 8:46 am

Groups in shower facility- multiple bldgs

NC-2009 WEp1: Water Use Reduction
posted by Marcio Alberto Casado Pereira on May 22, 2012, 3:28 pm

We have a factory of 4 buldings. All the FTEs/users from all buildings will be using the shower facilities of one of the buildings - bldg "P10". Therefore, the main users are the FTEs from the 3...

Last reply: Udana Ratnayake, Jul 27, 2012, 6:22 am

sanitary installations within tenant fit-out

NC-2009 WEp1: Water Use Reduction
posted by Jens Glöggler on Jul 18, 2012, 3:18 am

Hello all,
Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage. LOv3 for core&shell produces generic data based...

Last reply: Udana Ratnayake, Jul 27, 2012, 5:24 am

Contaminants of Concern & Green Globes

General forums
posted by John Chyz on Jun 13, 2012, 1:07 pm

As a certified Green Globes Assessor, I could not help but take issue with the comment that Green Globes has "stronger ties to mainstream industries and lobbyists". I believe that BuildingGreen...

Last reply: Hernando Miranda, Jul 26, 2012, 11:01 pm

WEc3 Baseline- or Existing Efficiency?

CI-2009 WEp1: Water Use Reduction
posted by MacKenzie King on Jul 26, 2012, 7:52 pm

We're looking to pursue this credit, but are a bit confused how the baseline is calculated for an interior renovation project with a portion of new construction. Our mechanical engineer seems to...

Last reply: Tristan Roberts, Jul 26, 2012, 10:09 pm

Occupancy sensors: valid lighting control?

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Amanda Redmond-Neal on Aug 17, 2011, 1:27 pm

I have an individually occupied "office" (kind of like a coat-check, really) that for some reason was built with only an occupancy sensor and no wall switch. Does the occupancy sensor count as a...

Last reply: Lauren Sparandara, Jul 26, 2012, 8:39 pm

Regional/recycled materials

General forums
posted by Hernando Miranda on Jul 25, 2012, 5:38 pm

"For recycled materials qualifying under MRc4 also being applied to MRc5, it is “not necessary to track the origin of the...

Last reply: Hernando Miranda, Jul 26, 2012, 4:29 pm

Automatic Lighting Shutoff for tenant spaces

CS-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Jul 4, 2012, 7:27 pm

Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)?

Last reply: Marcus Sheffer, Jul 26, 2012, 12:26 pm

Lighting power densities for building exteriors

CS-2009 EAp2: Minimum Energy Performance
posted by Rosana Correa on Jul 26, 2012, 11:12 am

The maximum power allowance for building façades is 2.2 W/m2 for each illuminated wall or surface. If I have two façades, one of them below 2.2W/m2, and the other above this limit, can I...

Last reply: Marcus Sheffer, Jul 26, 2012, 12:24 pm

Alternative Compliance Path for Projects outside the US

CI-2009 IEQc2: Increased Ventilation
posted by Marco Abdallah on Jul 20, 2012, 4:33 am

Hi,
can we use the "Alternative Compliance Path for Projects outside the US" which has been launched for New Construction and Major Renovations for a CI Project?
The credit content...

Last reply: Dylan Connelly, Jul 26, 2012, 12:04 pm