Forum quick links
Baseline HVAC system type
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Diverse uses located within LEED project boundary
CS-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Brazilian equivalent standard
CI-2009 EAp2:Minimum Energy Performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
PI Form 2: MPR7
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Aline Luther on
For a project of a commercial interior (commercial office in a commercial building) the gross floor area correspond to the total area of the office?
V4 District Thermal Energy
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Holmes on
What guidelines should be used for district thermal energy systems in v4 when using option 1, specifically combined heat and power systems?
Option 2 applicability to a Shopping Mall larger than 9290 m2
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Exterior lighting power allowance for an open-mall
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell). The common areas include an illuminated open mall.
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
Area clarification
CS-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y