Forum quick links
ACP % calculation
CS-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For the calculation of the % of energy cost influenced or directly controlled by CS Owner/Developer would the the latter be compared to the total energy cost of the proposed and not the baseline bu
Minimum Indoor Air Quality Performance Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Lorenna Lobo on
Hello, I'm trying to use the Minimum Indoor Air Quality Performance Calculator. I put the single zone option, but the Voz space is always 0, as well as the Vot space.
hotel fitness room
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Erin Holdenried on
LEED's definition of a regularly occupied space is one where individuals normally spend more that one hour per person per day on average.
Modeling Software Changing
NC-2009 EAp2:Minimum Energy Performanceposted by Muzamil Rafique on
Hello Marcus, I have question regarding the energy simulation software.
Legal Wood- ID Point
Pilot-Credits MRpc102:Legal Woodposted by Emily Loquidis on
Is there potential to use this as an Innovation point in addition to the ACP Credit for MRc7? Has anyone been successful with this?
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
EBOM-2009 MRp1: Sustainable Purchasing Policy & VOCs?
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Marie Kirk on
Looking at the policy example for the sustainable purchasing policy, it mentions VOC limits for architectural applications and specialty applications.
PV - how is it accounted for?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by sue bryant on
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.
LEED Boundary for CI and SSc1
CI-2009 SSc1:Site Selectionposted by Maria Papiez on
My project is pursuing path 7 - water efficient landscaping - for SSc1. It is my assumption that our LEED Boundary should include the landscaped site as well as the building tenant space.
C&S Default Occupancy counts for Assembly usage
CS-2009 PIf3:Occupant and Usage Dataposted by cathy keagle on
Hi, We have a CS v2009 building that is a mixed use occupancy. We are trying to project the occupancy, A-3 General Assembly portion, using the default occupancy counts.