All water reduction through recycling
NC-2009 WEc3:Water Use Reductionposted by Melissa Merryweather on
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p
manage (rainwater) on site
NC-v4 SSc4:Rainwater managementposted by Manuel Martin Delgado on
Hi, Is reusing rainwater for flushing toilets an accepted solution for achieving this credit? Or is reusing for irrigation the only solution accepted? Thanks.
Minimum Unloading Ratio for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
For chillers in EnergyPlus I have to provide the data “Minimum Unloading Ratio”.
Gerrymandering
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kath Williams on
Our project preliminary review points toward gerrymandering the LEED project boundary. It is a golf course clubhouse with geothermal pond on an existing putting green and paths.
Historic Bldg Renovation being done in phases, C&D Waste calcs
NC-2009 MRc2:Construction Waste Managementposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
Shared Garage Situation
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by José Solis on
My LEED project will be using a garage that will be designed to serve multiple buildings.
Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Shared Parking
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by José Solis on
My LEED project will be using a garage that will be designed to serve four buildings.
Energy Recovery in baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.