Forum quick links
Fluch Out Complete - Fire Happened Near Building
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sara Zoumbaris on
We have a facility that has been complete and turned over to the owner for a few months but has not yet been occupied; the building is waiting for all furniture to be delivered and put into place.
Schools SS4.3 Low Emitting and Fuel Efficient Vehicle Signage
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Paul Cacciola on
Is it acceptable to have the Low Emitting and Fuel Efficient Vehicle Signage painted on the asphalt for the designated parking spaces or do they have to be signs on a post?
Recycling infrastructure - inconsistency in reference guide
ND-Plan-v4 GIBc16:Solid waste managementposted by Nate Tsang on
The requirements and the step-by-step instructions are inconsistent.
Multiple AHUs for one space
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Patrick Cellie on
I'm currently dealing with a convention center that has large ballrooms and meeting rooms served by multiple AHUs.
Exhaust in Copy Rooms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Charline SEYTIER on
In one of our projects, the client is willing to have open spaces with high flexibility. In these open spaces, “boxes in the box” for copy rooms will be created.
Emission Reporting (ISO 14064/ Portfolio Manager)
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Esteban Martinez on
Hi, We are working in a project in Colombia.
How i can use Portfolio Energy Star to Colombia
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Esteban Martinez on
Hi, We have a project that aims LEED EBOM certification. The project is a school. We enter the data of energy consumption and water consumption in Portfolio Energy Star.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.