Forum quick links
LEED Boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by ABDUL MUTHALIB MOHAMED on
I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.
n/a
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Anastasia Makarenko on
Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.
Is green space above underground parking previous or impervious?
NC-v4 SSc4:Rainwater managementposted by Valentin Grimaud on
Dear all, We are currently wondering what is th ruling in the case of an underground parking being below a green space area, which we would tend to account for in the pervious area contribution fo
Insulation of Piping Cast into Concrete
NC-2009 EAp2:Minimum Energy Performanceposted by André Harms on
We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i
25'-0" Max Footpath to Main Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Kelsey Jensen on
Our current project places the main staircase in view of the main lobby and corridor.
District Co generation Plantby
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the
Help with LEED assessment from USGBC?
posted by Susannah Goddard on
I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.
Number of chillers in Energy Model
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Izumi Takayama on
Hi, I am currently preparing an energy model for a data center project (system 8).
Can this school building apply for LEED for School?
Schools-2009 MPR3:Must use a reasonable site boundaryposted by Leanne Niu on
There is a school building which has 5 floors, the project owner wants to do indoor decoration for only F1-F3 and the other two floor(F4-F5) will not be furnished.