Log in
Forum
Topic

Changing Total Gross Floor Area in PIf2 during Preliminary Design Review

NC-2009 PIf2: Project Summary Details
posted by Edgar Arevalo on May 5, 2020, 2:51 am

I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft. documented in...

Last reply: Allen Cornett, Jun 5, 2020, 12:41 pm

Deadline to respond to preliminary review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by ZHANG Yating on May 10, 2020, 1:29 am

Hi LEED Users,

I am facing an urgent problem. Our team has received Preliminary Review for our project ( LEED V4, CS ) two months ago, for some unforeseen reason,we miss the received and...

Last reply: Allen Cornett, Jun 5, 2020, 12:22 pm

LEED version 2009 Sunset admist COVID-19

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Hannah Lee Sevilla on May 28, 2020, 3:23 am

Hello to all! I hope for everyone's safety and health during these uncertain times.

My team is just wondering, are there any updates from the USGBC/...

Last reply: Allen Cornett, Jun 5, 2020, 11:36 am

Threshold to Achieve 1 Point?

NC-2009 EAc6: Green Power
posted by Aurora Smith on May 29, 2020, 10:14 am

We're submitting in v2009 and the form indicates that "Must be at least 35% for credit compliance and at least 70% to earn exemplary performance." 35% achieves 2 points though and we're...

Last reply: Aurora Smith, Jun 5, 2020, 11:12 am

South-East Asia Alternative Compliance Path for ASHRAE 90.1-2010

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by dianti avo on May 27, 2020, 12:14 am

Hello,

Is there any Alternative Compliance Path for ASHRAE 90.1-2010 (mandatory provision) for South-East Asia region?

Thanks!

Last reply: Marcus Sheffer, Jun 5, 2020, 10:19 am

ENERGY STAR equivalent in Australia

CI-v4.1 EAc2: Optimize Energy Performance
posted by Cyrene Lee on Jun 2, 2020, 12:08 am

Hi, my project is in Australia and as ENERGY STAR is not used here to rate electrical appliances there are some appliances that have been chosen that are high performing according to our star...

Last reply: Marcus Sheffer, Jun 5, 2020, 10:11 am

Preliminary review- Dorm rooms classified as dwelling units

Hospitality-NC-v4 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Jun 4, 2020, 1:03 pm

Dear All,

we received yesterday the Preliminary Review Report of an Hospitality Building.

In what relates with the Minimum Energy Performance...

Last reply: Marcus Sheffer, Jun 5, 2020, 10:07 am

AIR TEST OPTION

NC-v4 EQc4: Indoor air quality assessment
posted by LUCY WILLIAMS on Dec 4, 2018, 12:56 pm

Have any teams successfully conducted and passed the air test?  Can you provide any tips on how to do so?  

Last reply: Russ Pellegrino, Jun 5, 2020, 10:04 am

Is residential project are not eligible for Option 2?

NC-v4.1 WEc3: Cooling Tower and Process Water Use
posted by Leanne Niu on Jun 5, 2020, 2:56 am

we have a residential project with no cooling tower, if it is eligible for Option 2?

Is tehre a reference as to which costs are to be considered?

NC-v4.1 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Benjamin Weise on Mar 23, 2020, 3:39 am

Hi,

this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors.

The...

Last reply: Shawn Keith, Jun 4, 2020, 3:27 pm