Can ID+C be selected for whole building?
posted by Leo LeQuoc on
Our team is working on a project of a whole 2-storey (to be) newly constructed office building.
Replacement of 65% cement by GGBFS
posted by Muhammad Hussain on
Dear LEED Users,
May I kindly request guidance on the permissible percentage of GGBFS that can replace cement and the credit category that our project can potentially earn points under?
LEED certification for advanced construction process
posted by Glenn Roosen on
Good afternoon,
New Requirement? CDPH Emissions Testing Under Certain Conditions?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Brian Salazar on
I have recently had LEED review for LEM kicked back because the Greenguard Gold or other material certificates were presumed under CDPH v1.2 for Classroom environment vs Office environment.
Energy and Atmosphere
posted by Birgitte Messerschmidt on
Add that if installing Battery Energy Storage systems this should be done in accordance with NFPA 855.
Energy and Atmosphere
posted by Birgitte Messerschmidt on
Adding PV panels to an existing building can impact the fire performance of the existing roof assembly. Hence if PV panels are added to an existing building the buildings fire and el
Enhanced Resilient site design
posted by Birgitte Messerschmidt on
I am thrilled to have wildfire part of this credit but the text provided is not very clear and also not up to date in some of its references.
Location and transportation
posted by Birgitte Messerschmidt on
Add the need for a fire safety review of charge points if these are within or directly adjacent to the building.
Operational Planning and Response for Resilience
posted by Birgitte Messerschmidt on
Missing that the emergency response plan should be communicated to the local fire department.