Forum quick links
How the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1?
CS-v4 EAp2:Minimum energy performanceposted by Homer Wang on
Where or which book we can find about how the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1 just like what type building or how large build is considered and how long duc
default visitor count for retail projects
Retail-NC-v4 LTc6:Bicycle facilitiesposted by Gail Napell on
we're doing a C+S with a retail lease space. How do we determine the retail visitor count for this credit, WE, etc.? i thought i saw this in v2009 but now i can't find it - can someone
ILFI Unconference
posted by Anne Hicks Harney on
We are T-minus two days from the ILFI unconference and I am looking forward to seeing a bunch of you there. I have a vague memory about there being a meet up scheduled - can somebody rem
DES Baseline and Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Bas Peeters on
Dear all,
Warehouse baseline system
CS-v4 EAp2:Minimum energy performanceposted by Instra Ingenieros on
Dear all,
Sharing Building-Level Energy Metering Data
NC-v4 EAc3:Advanced energy meteringposted by Francis Hernández on
We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems. The meters and submeters
Compliant laboratory and medical equipment
NC-v4 WEc2:Indoor water use reductionposted by LEED Pro Consultant on
For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?
Lack of Sunday bus service
NC-v4 LTc5:Access to quality transitposted by Karen Joslin on
I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?
Base Building certifcation in progress
CI-2009 PIf5:Previously LEED Certified Detailsposted by Gail Napell on
we have a v2009 project in a base building that's in process for LEEDv2009 EBOM certification. We're ready to submit the design credits for review, but the landlord doesn't expect to have the