Forum quick links
IEQc4.3 Listing Floor Tile in form on LEED Online
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Melanie Blacklock on
We have 17 different types of ceramic tile on a job I'm documenting in LEED Online. Since ceramic tile qualifies for IAQ credit points automatically, do I need to itemize the tile in the
Contact at USGBC for LEED ND
ND-v4 MPR1:Must be in a permanent location on existing landposted by Martine Desbois on
I am looking for a contact at USGBC to discuss our project. I cannot seem to be able to reach my previous contacts. Can you suggest someone I can talk to. Thank you, Martine
documentation toolkit
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Courtney Royal on
i was looking at the uploaded cutsheet under the documentation toolkit, and it doesn't look that piece of equipment is meeting the credit requirements.
Best Practice numbers
posted by Andrea Lemon on
Is there a list of which number corresponds with each Best Practice? E.g. "03 Energy Audit & Planning."
help understanding how to select equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Courtney Royal on
I am having a difficult time understanding how to guide the mechanical designer on specifying compliant equipment.
LEED CI V4 Tenant space modeling interpretation
CI-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,
Contracted Waste and Recycling Service
CI-v4 MRp1:Storage and collection of recyclablesposted by Summer Minchew on
I have a LEED CI project in a building whose contracted waste service does not provide glass recycling due to "depressed markets" and provides single-stream waste and recycling pickup.
Fire Proofing for the Building Structure
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ali Soufan on
The building is steel structure, which will be painted with fire rated paint.
Which Option 2 strategies for a warehouse hall?
Warehouses-NC-v4 EQc6:Interior lightingposted by Frantisek Macholda on
Hello,