i was looking at the uploaded cutsheet under the documentation toolkit, and it doesn't look that piece of equipment is meeting the credit requirements. For instance, it is a 1.5 ton unit with R-410A refrigerant, and a Rc of 2.5. When you enter that into the calculator, it is not under 100 for the average refrigerant impact per ton. Am I missing something?