PC MRpc87 FeedbackPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on Sep 8, 2022, 3:45 am
Feedback from the architecture firm and general contractors re: PC implementation in Southern California
Last reply: Michelle Rosenberger, Mar 19, 2024, 12:12 pm |
|
WEp1_manual wateringNC-v4 WEp1: Outdoor water use reductionposted by Alex Edwards on Apr 29, 2022, 3:27 am
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water... Last reply: Santiago Avila, Mar 19, 2024, 5:32 am |
|
"7% for green vehicles "NC-v4 LTc8: Green vehiclesposted by Santiago Avila on Mar 18, 2024, 10:53 am
"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for... Last reply: Santiago Avila, Mar 19, 2024, 5:21 am |
|
No More Strigent ThanNC-v4 EQp2: Environmental tobacco smoke controlposted by Hannah Fleck on May 11, 2017, 4:06 pm
Hello, Last reply: Afogreen Build, Mar 19, 2024, 5:18 am |
|
Peak Shaving StrategiesNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Mar 18, 2024, 1:06 pm
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model. I am wondering, if electric vehicle charging was 'locked out'... Last reply: Dave Hubka, Mar 18, 2024, 2:02 pm |
|
LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
Energy modeling for unconditioned human occupied spacesNC-2009 EAp2: Minimum Energy Performanceposted by Yusuf Turab on Jul 15, 2010, 4:02 pm
I recently attended a course on energy modeling using eQuest. I was puzzled by the response of the instructor when asked how can one model an office building that is completely unconditioned.... Last reply: Muhammad Farooq Saeed, Mar 17, 2024, 9:26 pm |
|
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?NC-v4 SSc2: Site development - protect or restore habitatposted by Kathy Wong on Apr 13, 2021, 6:18 am
Hi all, The credit requires 1) preserve 40% of the... Last reply: Afogreen Build, Mar 17, 2024, 9:12 pm |
|
No-irrigation documentationNC-v4 WEp1: Outdoor water use reductionposted by Alexia Anastassiadis on Dec 12, 2022, 6:22 am
Hi all, Last reply: Afogreen Build, Mar 17, 2024, 9:04 pm |
|
Inclusion of Process Waste in Waste Performance CalculationEBOM-v4.1 MRp3: Waste Performanceposted by Subhashkumar A on Mar 16, 2024, 6:44 am
Hello, Our project building is a garment building, and its final product is dresses. It generates fabric waste during the production process, inherent to the nature of the production... |