NC-v4 EAc1:Enhanced commissioningposted by Brett Farbstein on
I have had success acting as the fundamental & enhanced CxA as an employee of the project architect as long as the design team included an outside MEP engineer in v2009.&nbs
energy recovery control
CS-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modelling a System 8 baseline model according to ASHRAE 90.1-2010.
An exhaust energy recovery system is needed according to table 6.5.6.1.
Number of Parking Spaces Required by Local Code.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Adrian Arenas on
Hello Everyone,
One quick question regarding SSc7.1
For Option 2, to comply with 50% of parking spaces undercover:
DES cooling load reduction
NC-v4 EAc4:Demand responseposted by Nuttanee Vongveeranonchai on
Dear all,
Number of points awarded for RP
NC-v4 RPc1:Regional priorityposted by Amrit Kaur on
How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?
Access to the refrigerant impact calculation
NC-v4 EAc6:Enhanced refrigerant managementposted by Mark Kumar Bose on
Hi,
how can I get access to the refrigerant impact calculation (on Leedonline.com) before registering in order to advice the planners if their selected refrigerant complies?
Energy & water use data sharing committment
NC-v4 EAp3:Building-level energy meteringposted by Lissa Spitz on
Does anyone know - is there actually any other approved third party format besides portfolio manager? Any help would be appreciated.
Achievement Rates for Exemplary Performance
NC-2009 MRc2:Construction Waste Managementposted by Francis Hernández on
Does LEED User have the achievement rates for exemplary performance of credits? We are a GC and currently have been awarded a project with a goal of achieving exemplary performance in constru
Achieving credit in a Rest Area
NC-v4 LTc7:Reduced parking footprintposted by Julie Hardy on
The provincial government is designing a Rest Area for an important Highway, the project will also is to be operated and owned by the provincial government.