Forum quick links
LEED and Elevators
NC-v4 EAp2:Minimum energy performanceposted by erica colleoni on
Hello everyone,
Off-site PV farm financed by property owner
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Dricka Brown Thobois on
I am working with a property who is going for LEED EBOM recertification. The property is owned by a large business that has financed, owns, and maintains, a very large PV farm on the wes
Not enough finishes to meet credit.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Max Krueger on
Hi,
I have a small building with less than 20 finishes. I presume this means the credit cannot be met?
Thanks,
Max
Clarification for Calculations to be provided
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristen Magnuson on
One of the requested items to document compliance with this credit is the following:
Motorcycle Parking space
NC-v4 SSc5:Heat island reductionposted by Floyd Valade on
Is motorcycle parking (still) included in the total parking calculation, for V4, SSC5-Heat Island Effect Credit-OP-2,Parking Under Cover? Thnx in adv.
Option 1: Smart-Phone Control
NC-v4 EQc6:Interior lightingposted by RDK E&S on
For option 1, is it acceptable for manual controls to be accomplished via a software interface rather than a physical switch?
Standby Losses
CI-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
How does one calculate the required Standby loss for a domestic hot water calorifier.
Outdoor air monitoring
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by VISHESH AGARWAL on
If TFAs are having manual dampers for fresh air intake so is we need to change the in motorised dampers which can be communicated by sensors.for the monitoring of the CO2 level in the space and the
VRV that controls laboratory ambient temperature should be classified as HVAC system or process
NC-v4 EAp2:Minimum energy performanceposted by SOLON YANG on
I encountered this situation when building the energy model: the laboratory's ambient temperature control was provided by VRV, which was closed, mainly for equipment testing, and the personnel