Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interior Cross Contamination Prevention - Building without spaces where hazardous gases or chemicals may be present

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ricardo Sá  on 

A large office building (> 10.000 m2) that does not include spaces where hazardous gases or chemicals may be present can still achive 1 point associated with Option 1 (Enhaced IAQ strategies), p

0

Rainwater treated in high performance rain gardens and runoff

NC-v4 SSc4:Rainwater management
posted by  Nita Christopher  on 

Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no infiltration potential.

1
Thu Sep 6, 2018, 2:55 pm

General Emissions Evaluation Fire Safing & Fire Blanket Ins.

NC-v4 EQc2:Low emitting materials
posted by  Jerimiah Luckett  on 

Has anyone else come across the issue of finding a CDPH v1.1-2010 compliant Safing Insulation or SAFB Insulation? The contractor submitted the Owens Corning/Thermafiber SAFB and Safing and accord

8
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Thu Sep 6, 2018, 2:02 pm

Multiple buildings

LEED Rating System Selection
posted by  Markéta Vagenknechtová  on 

Our client wants to certify a complex of three new industrial buildings. Which rating system should we use? Can be three buildings certified as one project?

2
Thu Sep 6, 2018, 2:18 am

Airport projects now have space type options available in LEED Online

LEED Rating System Selection
posted by  Ricardo Sá  on 

According to USGBC, Airport projects now have space type options available in LEED Online.

 

5
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Thu Sep 6, 2018, 12:45 am

IDc1.3 Green Housekeeping

Schools-2009 IDc1:Innovation in Design
posted by  Danielle Dunn  on 

We received comments back on this credit stating that the policy must follow the EBOM Policy Model. However, we are working with a new construction school. Does this still apply?

1
Wed Sep 5, 2018, 9:44 pm
3
Default Avatar
Deputy General Manager
LEAD Consultancy & Engineering Services
LEEDuser Basic Member
6 thumbs up
Wed Sep 5, 2018, 8:41 pm

Toilet is required for Changing Room?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Karl Heitman  on 

Hi.  I am inquiring if toilet is required as part of Changing Room for 2009 NC.  Can the Changing Room be just a shower and a small area to change?  Thanks in advance for your f

1
Wed Sep 5, 2018, 9:45 pm

Limited to five products per manufacturer?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Elizabeth Kertesz  on 

The LEED User guidance on this credit includes the following sentence:  "But just by switching things up a little you can still make this work, since you’re allowed to include up to five produ

3
President
Resilient Oak Consulting, LLC
LEEDuser Premium Member
9 thumbs up
Wed Sep 5, 2018, 6:59 pm

ULEF documentation and LEED Online form

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Erica Downs  on 

How does one document use of a ULEF melamine in LEED Online? There is only a check box for "Product Contains No Added Urea-Formaldehyde".

7
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Wed Sep 5, 2018, 6:22 pm