Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Attached building within the LEED boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Omar Elrawy  on 

I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED.  I need to know if that compli

0

Definition of Material Streams

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Christopher Russell-King  on 

Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".

8
Wed Oct 17, 2018, 7:07 pm

Universal Notification Requirements

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Kristen Paradiso  on 

What needs to be included in a universal notification about a Tier 2 pesticide application? I've found old documentation stating a "Signal Word" needs to be included. Is this still required?

1
Wed Oct 17, 2018, 3:33 pm
7
Principal
KieranTimberlake
LEEDuser Basic Member
3 thumbs up
Wed Oct 17, 2018, 2:41 pm

Diferent product references of one of several brands in same EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ricardo Sá  on 

Hi All,

According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Wed Oct 17, 2018, 10:29 am

Kitchen faucet for restaurant project

CI-v4 WEc1:Indoor water use reduction
posted by  Borja Sánchez  on 

Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning s

3
Wed Oct 17, 2018, 1:08 am

Non-official Bicycle Network

CI-v4 LTc4:Bicycle facilities
posted by  Jonathan Koh  on 

Hi, my project is located in Ho Chi Minh city and there is no dedicated bicycle network near my building site except for main roads for the traffic.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 17, 2018, 1:03 am

CS-v4 IPc1 - Integrative Process (Design Charrette)

NC-v4 IPc1:Integrative process
posted by  Estra Marku  on 

I was wondering if anyone can shed some light on whether it would be acceptable to conduct a Design Charrette over the course of 4 days, as opposed to a 4 hour charrette in one day?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 16, 2018, 10:15 pm

Thermal Comfort Ranges

NC-v4 IPc1:Integrative process
posted by  Danilo Ilic  on 

The part "Assess Thermal Comfort Ranges" is not very clear for me.

1
Tue Oct 16, 2018, 5:32 pm