Forum quick links
Attached building within the LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Omar Elrawy on
I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED. I need to know if that compli
Definition of Material Streams
NC-v4 MRp2:Construction and demolition waste management planningposted by Christopher Russell-King on
Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".
Universal Notification Requirements
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kristen Paradiso on
What needs to be included in a universal notification about a Tier 2 pesticide application? I've found old documentation stating a "Signal Word" needs to be included. Is this still required?
Diferent product references of one of several brands in same EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ricardo Sá on
Hi All,
According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.
Which Prescriptive Compliance guidelines for large office buildings?
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Sareet Benayahu on
Hi,
Kitchen faucet for restaurant project
CI-v4 WEc1:Indoor water use reductionposted by Borja Sánchez on
Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning s
Non-official Bicycle Network
CI-v4 LTc4:Bicycle facilitiesposted by Jonathan Koh on
Hi, my project is located in Ho Chi Minh city and there is no dedicated bicycle network near my building site except for main roads for the traffic.
CS-v4 IPc1 - Integrative Process (Design Charrette)
NC-v4 IPc1:Integrative processposted by Estra Marku on
I was wondering if anyone can shed some light on whether it would be acceptable to conduct a Design Charrette over the course of 4 days, as opposed to a 4 hour charrette in one day?
Thermal Comfort Ranges
NC-v4 IPc1:Integrative processposted by Danilo Ilic on
The part "Assess Thermal Comfort Ranges" is not very clear for me.