Topic | Recent |
---|---|
Kitchens and regular occupancy (multi-familiy housing)NC-2009 IEQc8.2: Daylight and views - viewsposted by Walter Currin on May 27, 2010, 9:47 am
I am working in a project team designing apartments geared for college students. We are planning on considering our kitchens as non-regularly occupied spaces. The reference guide does not say... Last reply: Jean Marais, Apr 27, 2012, 8:51 am |
|
Eligibility of directly used groundwaterNC-2009 EAc2: On-Site Renewable Energyposted by Jens Apel on Jun 3, 2010, 7:45 am
I am working on a European project where groundwater is directly used for space cooling without any vapor compression cycle. The system is approved by he local authorities. Last reply: Jens Apel, Nov 3, 2011, 5:28 am |
|
Achieving Brownfield Redevelopment credit without Phase II ESANC-2009 SSc3: Brownfield Redevelopmentposted by Waylon Lo on Jun 11, 2010, 3:06 pm
We are working on a major renovation of an existing office building built in 1951. A Phase I ESA study and sampling of suspectg asbestos-containing materials, lead-contatining paint, mold and... Last reply: Larry Sims, Jun 28, 2010, 3:26 am |
|
LEED for Schools Credit 4.6- question about roofing insulationSchools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Peggy White on Jun 19, 2010, 7:01 pm
Hello - I hope this is the correct place to post this question: Does LEED for Schools IEQ Credit 4.6, Low-Emitting Materials - Ceiling Last reply: Tristan Roberts, Nov 4, 2013, 9:32 pm |
|
Lighting Controls in Open Library Stack and Reading AreasNC-2009 IEQc6.1: Controllability of systems - lightingposted by Tate Walker on Jun 23, 2010, 3:54 pmunderfloor air and spacing registers accordingly and then using task lighting. Stacks are exempt. Unfortunately I cannot share the documentation, but would happy to provide continued input in this forum... Last reply: Abena Darden, Jul 13, 2010, 3:48 pm |
|
Phased building construction and LEED--any references or adviceGeneral forumsposted by Walt Zapor on Jun 24, 2010, 4:52 pm
A school project - a renovation - is planned to seek LEED certification and consists of: Last reply: David Posada, Oct 8, 2010, 12:55 pm |
|
Energy modeling for unconditioned human occupied spacesNC-2009 EAp2: Minimum Energy Performanceposted by Yusuf Turab on Jul 15, 2010, 4:02 pm
I recently attended a course on energy modeling using eQuest. I was puzzled by the response of the instructor when asked how can one model an office building that is completely unconditioned.... Last reply: Muhammad Farooq Saeed, Mar 17, 2024, 9:26 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by kelvin duen on Jul 20, 2010, 3:13 pm
I'm having a little confusion as to what "... Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm |
|
Pressure of water supply for faucets/showerheadsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Yong Lee Low on Jul 27, 2010, 4:10 am
Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building... Last reply: Jenny Carney, Aug 18, 2010, 11:45 am |
|
Help With SS Credit 1 Option 2 Path 6CI-2009 SSc1: Site Selectionposted by Ben Maxwell on Jul 27, 2010, 3:34 pm
I am currently trying to get a lighting design to comply with SS Credit 1 Option 2 Path 6 and have a question. To get this credit there is a stipulation that the "After-hours override maybe... Last reply: Rubén M. R., Feb 14, 2013, 1:44 pm |