Log in
Forum
Topic

Option 3- Product Manufacturer Supply Chain Optimization

CI-v4 MRc5: Building product disclosure and optimization - material ingredients
posted by Edgar Arevalo on May 10, 2022, 4:24 pm

Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?

I look at the template on LEED Online for this credit, and it says for this...

90.1-2010 AEDG?

Retail-CI-v4 EAc2: Optimize Energy Performance
posted by Vanessa Nelson on May 10, 2022, 3:25 pm

Has a 90.1-2010 AEDG been published yet or is 2004 the most recent? Thanks

Existing Ice Machine

CI-v4 WEp1: Indoor water use reduction
posted by Michelle Rosenberger on Aug 22, 2019, 1:41 pm

The Prerequisite is pretty explicit that it only applies to newly installed fixtures. What happens if the ice machines are existing?

Last reply: Michelle Rosenberger, May 10, 2022, 11:11 am

PM-10 Testing

NC-v4 EQc4: Indoor air quality assessment
posted by Robert Cashins on May 9, 2022, 5:02 pm

What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?

Is real time monitoring acceptable?

What specific methods have been...

v2009: Design Submittal doubts

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Victoria Rios Esteve on May 10, 2022, 7:17 am

Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30.

We have 2 main...

The number of water meters required

CS-v4 WEc4: Water metering
posted by Erkki Seinre on Jul 4, 2019, 4:32 am

How detailed does the sub-metering have to be to account for 'at least 80% metered subsystem'?

If a building has only indoor plumbing fixtures (WC, taps, showers) and landscape irrigation...

Last reply: Dina El-Sady, May 10, 2022, 7:16 am

LEED v4.1 Views definition of Nature

NC-v4.1 EQc8: Quality Views
posted by Margaret Montgomery on May 9, 2022, 6:11 pm

In this reconfiguration of the credit, it's a bit ambiguous in its requirement for nature, urban landmarks or art. Is it reasonable to assume that "nature" includes the category previously called...

Safety-first measure duration and recurrence of survey application

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Malenny Jimenez on Mar 18, 2022, 2:11 pm

My team would like to know if there is a lenght of time for which these requirements are to be complied. Is this credit thought out specifically for the COVID pandemic or is it intended to be...

Last reply: Agnes Vorbrodt, May 9, 2022, 1:23 pm

Carbon Sequestration outside the US

Pilot-Credits SSpc158: Assess and Increase Onsite Carbon Sequestration Through Plantings
posted by Oliver Pearce on Nov 17, 2021, 1:47 am

Hi,

It seems that the tool for this Pilot Credit can only be used on projects within the US.  Is there any way of meeting these requirements on non-US projects - a similar tool for...

Last reply: , May 9, 2022, 1:16 pm

No Zone 2, Factor Zone 1 BCTR by 2/3?

Pilot-Credits SSpc55: Bird collision deterrence
posted by Heather DeGrella on Feb 10, 2015, 11:56 am

I am editing this question to hopefully make it more clear.

Our project is hoping to achieve Bird Collision Deterrence. We have a question on the spreadsheet calculations. If the entire...

Last reply: Jacqueline Da Rocha, May 9, 2022, 12:47 pm