Topic | Recent |
---|---|
Option 3- Product Manufacturer Supply Chain OptimizationCI-v4 MRc5: Building product disclosure and optimization - material ingredientsposted by Edgar Arevalo on May 10, 2022, 4:24 pm
Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator? I look at the template on LEED Online for this credit, and it says for this... |
|
90.1-2010 AEDG?Retail-CI-v4 EAc2: Optimize Energy Performanceposted by Vanessa Nelson on May 10, 2022, 3:25 pm
Has a 90.1-2010 AEDG been published yet or is 2004 the most recent? Thanks |
|
Existing Ice MachineCI-v4 WEp1: Indoor water use reductionposted by Michelle Rosenberger on Aug 22, 2019, 1:41 pm
The Prerequisite is pretty explicit that it only applies to newly installed fixtures. What happens if the ice machines are existing? Last reply: Michelle Rosenberger, May 10, 2022, 11:11 am |
|
PM-10 TestingNC-v4 EQc4: Indoor air quality assessmentposted by Robert Cashins on May 9, 2022, 5:02 pm
What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2? Is real time monitoring acceptable? What specific methods have been... |
|
v2009: Design Submittal doubtsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Victoria Rios Esteve on May 10, 2022, 7:17 am
Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30. We have 2 main... |
|
The number of water meters requiredCS-v4 WEc4: Water meteringposted by Erkki Seinre on Jul 4, 2019, 4:32 am
How detailed does the sub-metering have to be to account for 'at least 80% metered subsystem'? If a building has only indoor plumbing fixtures (WC, taps, showers) and landscape irrigation... Last reply: Dina El-Sady, May 10, 2022, 7:16 am |
|
LEED v4.1 Views definition of NatureNC-v4.1 EQc8: Quality Viewsposted by Margaret Montgomery on May 9, 2022, 6:11 pm
In this reconfiguration of the credit, it's a bit ambiguous in its requirement for nature, urban landmarks or art. Is it reasonable to assume that "nature" includes the category previously called... |
|
Safety-first measure duration and recurrence of survey applicationPilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Malenny Jimenez on Mar 18, 2022, 2:11 pm
My team would like to know if there is a lenght of time for which these requirements are to be complied. Is this credit thought out specifically for the COVID pandemic or is it intended to be... Last reply: Agnes Vorbrodt, May 9, 2022, 1:23 pm |
|
Carbon Sequestration outside the USPilot-Credits SSpc158: Assess and Increase Onsite Carbon Sequestration Through Plantingsposted by Oliver Pearce on Nov 17, 2021, 1:47 am
Hi, It seems that the tool for this Pilot Credit can only be used on projects within the US. Is there any way of meeting these requirements on non-US projects - a similar tool for... Last reply: , May 9, 2022, 1:16 pm |
|
No Zone 2, Factor Zone 1 BCTR by 2/3?Pilot-Credits SSpc55: Bird collision deterrenceposted by Heather DeGrella on Feb 10, 2015, 11:56 am
I am editing this question to hopefully make it more clear. Our project is hoping to achieve Bird Collision Deterrence. We have a question on the spreadsheet calculations. If the entire... Last reply: Jacqueline Da Rocha, May 9, 2022, 12:47 pm |