Forum quick links
LT Prerequisite: Transportation performance
posted by Gaston Michaud on
Hello everyone!
Airflow monitor alarms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nancy Henderson on
We have several single zone RTU's that will need direct airflow monitors because the units have DCV. The contractor says the low OA alarm will be located on the units at the roof. They
Replacement for the demolished walls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Simon Sue on
In a CI tenant finish-out, if existing interior partitions are demolished and new interior partitions are constructed in an original configuration (not matching to the demolished partition lay
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
Fire Station minimum parking?
NC-v4 LTc7:Reduced parking footprintposted by Erin Holdenried on
Looking for suggestions on how to determine the parking ratio for a Fire Station. There doesn't seem to be any use within the Base Ratios Table that align with a Fire Station.
Savings from economizers for boilers for manufacturing proces
NC-v4 EAc2:Optimize energy performanceposted by Thomas Tan on
Dear All,
How many SF and which area of the building needs Bird Collision Threat.
Pilot-Credits SSpc55:Bird collision deterrenceposted by Miguel Rivera on
Hi, I'm a little confused.
All year round shaded area
CS-v4 SSc5:Heat island reductionposted by Frantisek Macholda on
Hi, we have a square atrium in the middle of the building.
Chemical Inventory for material other than chemical....
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by PAWAN DAHIWAL on
How does material which don't have any chemical content OR no chemical used during its manufacturing but is a permanent building material, comply with credit? For example Granite OR marbl