Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
3
Default Avatar
Allied Environmental Consultants Limited
LEEDuser Basic Member
3 thumbs up
Tue May 28, 2019, 4:11 pm

Inherent Bias Training

Green Commons
posted by  Michelle Amt  on 

Has anyone done inherent bias training in their firm, and if so, how'd it go? Do you have someone you'd recommend as a trainer/facilitator?   Thanks!

15
Tue May 28, 2019, 12:59 pm

Pilot Credit 82: Local Food Production as Innovation Credit

EBOM-v4 INc1:Innovation
posted by  Nicole Isk  on 

We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a

1
Mon Jul 15, 2019, 10:50 pm

Cooling tower counted in WEp2?

NC-v4 WEp2:Indoor water use reduction
posted by  Hieu Huynh  on 

Hi LEED experts, my factory has a cooling tower but it's for manufacture process, not for the HVAC system. Will this type of Cooling tower be taken into account for this Prerequisite?

1
Tue May 28, 2019, 8:48 pm

Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rachel Manoguerra  on 

The project I am working on is "complete" and the owner wants to submit for final LEED review.  However, the PV has been delayed and not installed on the project.

3
Sat May 25, 2019, 4:37 am

Enhanced Commissioning and Measurement and Verification

NC-2009 EAc3:Enhanced Commissioning
posted by  Saju Varghese  on 

Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.

3
Default Avatar
RLBA
LEEDuser Premium Member
1 thumbs up
Sat May 25, 2019, 4:25 am

Monitoring-based Cx frequency of analysis and approach clarification

NC-v4 EAc1:Enhanced commissioning
posted by  Kevin Day  on 

LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification." 

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Sat May 25, 2019, 4:21 am

Drawing Review

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Steve Connelly  on 

Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?

16
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Sat May 25, 2019, 4:12 am

Onsite Apiary

Pilot-Credits SSpc82:Local food production
posted by  Stephen Ward  on 

Does having an apiary on our campus count towards the amount of area reserved onsite for food production?

1
Wed May 6, 2020, 11:33 pm

Calculating landscaping

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Tracy Jordre  on 

My question is related to both the Protect or Restore Habitat and Open Space credits.  In the past I have included the total area of any landscaping bed, not just the area of each plant themse

1
Thu May 30, 2019, 12:04 am