Forum quick links
Core & Shell Data Center (saving from IT load in tenant spaces)
CS-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Inherent Bias Training
posted by Michelle Amt on
Has anyone done inherent bias training in their firm, and if so, how'd it go? Do you have someone you'd recommend as a trainer/facilitator? Thanks!
Pilot Credit 82: Local Food Production as Innovation Credit
EBOM-v4 INc1:Innovationposted by Nicole Isk on
We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a
Cooling tower counted in WEp2?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts, my factory has a cooling tower but it's for manufacture process, not for the HVAC system. Will this type of Cooling tower be taken into account for this Prerequisite?
Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Manoguerra on
The project I am working on is "complete" and the owner wants to submit for final LEED review. However, the PV has been delayed and not installed on the project.
Enhanced Commissioning and Measurement and Verification
NC-2009 EAc3:Enhanced Commissioningposted by Saju Varghese on
Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Drawing Review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Steve Connelly on
Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?
Onsite Apiary
Pilot-Credits SSpc82:Local food productionposted by Stephen Ward on
Does having an apiary on our campus count towards the amount of area reserved onsite for food production?
Calculating landscaping
NC-v4 SSc2:Site development - protect or restore habitatposted by Tracy Jordre on
My question is related to both the Protect or Restore Habitat and Open Space credits. In the past I have included the total area of any landscaping bed, not just the area of each plant themse