Forum quick links
Structural composite wood and moisture resistant adhesives - compliance and supporting documentation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Esther Ma on
Hello LEED User community,
Community revitalization program and its compliance with Option 2
Warehouses-NC-v4 LTc3:High priority siteposted by Agnieszka Rylska on
We are engaged in LEED certification process of the distribution center located in the area which is covered by current community revitalization program.
Group certification - calculating and placing bike racks
CS-v4 LTc6:Bicycle facilitiesposted by Barbora Cicvárková on
Hi all,
we are pursuing group certification for project with 5 separated above ground buildings (section A,B,C,D,E) connected with underground parking garages.
Can mixed paper and corrugated cardboard be collected and stored together?
CS-v4 MRp1:Storage and collection of recyclablesposted by Erkki Seinre on
According to this prerequisite, the project should have dedicated areas for the collection and storage of mixed paper, corrugated cardboard, glass, plastics, metals, plus two or more waste streams
VOC compliance and Lab Test Reports
NC-v4 EQc2:Low emitting materialsposted by Samantha Lee on
Hi everybody.
T-shaped Space Alternative?
Pilot-Credits INpc125:Inclusive Designposted by Kristi Ennis on
#1 Physical Access proposes that the size of the turning space be increased to a 6' diameter (in lieu of 5').
Task Lighting for Ergonomics?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Kristi Ennis on
We are wondering if there is any research indicating that task lights with articulating arms are beneficial to proper ergonomics. Has anyone seen anything on this?
Vegetated Roof and Roof Planters
CS-v4 SSc5:Heat island reductionposted by Lou Niles II on
We have a project with a Roof / Terrace space. This space has turf areas and also some Planters; along with the walkable "pavers" and concrete areas.
O+M Table of Contents requirement for v4 Fundamental commisioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Robert Fernandez on
I provided our primary LEED review with all of the following individually as each has its own upload to meet the intent of the credit but am being requested for an O+M table of contents for Fu