NC-v4 SSc3:Open spaceposted by Anastasia Huggins on
We are looking at submitting this for a LEED Campus submittal but have some questions about the calculations.
Waste audit
EBOM-v4.1 MRp3:Waste Performanceposted by Jorge Lopez de Obeso on
Hello everyone.
We have a hotel project that is inside a core and shell LEED Certified building.
New sustainability position open at Lake|Flato
posted by Heather Holdridge on
Please share this info with any contacts you have that you think would be a good candidate for our Design Performance Coordinator position -- Thanks!
V4.1 credit for v4 project NC-v4.1 SSc4 - Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Ryan Harrington on
If my project is v4 and choose to use the V4.1 path for rainwater management, does the new point scoring also take effect? Basically my project has a meet the 95th percentile under v4 but if I
SCL Summit Report Now Available
posted by Candace Pearson on
Hi all,
Our team has been working hard to wrap up this year's SCL Summit Report, and we're excited to announce that it is finally complete!
WE Outdoor water reduction
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Geneva Guerin on
Are potted plants and trees (in raised beds on outdoor covered terraces within the site boundary), counted as vegetated surfaces for this prerequisite?
Disturbed site
CS-v4 SSc3:Open spaceposted by Guillaume Rose on
Hello,
In the case of a rehabilitation project in the center of Paris, on a 100% mineral site, is this requirement applicable?
Where to find the appropriate base ratios for parking reduction, LEED V4.1
CS-v4.1 LTc7:Reduced Parking Footprintposted by Chen Shalita on
According to LEED V4.1 the new baseline for parking reduction is the "Transportation Planning Handbook: Table 11-12".
Define "transit route" for the extra point gained with no on route providing more than 60% of the documented levels
NC-v4 LTc5:Access to quality transitposted by Evie Bird on
Pertaining to this extra point in LEED v4 -"Projects served by two or more transit routes such that no one route provides more than 60% of the documented levels may earn one additional point, up to
CxA from early-design/peer review team?
CI-2009 EAc2:Enhanced Commissioningposted by Frances Yang on
Does anyone know if the CxA would be allowed to come from the same firm as the team that performed design up through 100%DD and then peer review of the design-build trades that took over desig