Does anyone know if the CxA would be allowed to come from the same firm as the team that performed design up through 100%DD and then peer review of the design-build trades that took over design for CD phase?  Would this differ for fundamental vs. enhanced?  The project is LEEDv4 CI of about 17,000sf.  Thanks in advance!