Forum quick links
Modeling Evaporative cooling systems (ambiator)
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
Hi all, Iam modelling ambiator for a factory building in India. My baseline system is Packaged VAV.
heat recovery in baseline
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm using v2009_Minimum Energy Performance Calculator_v09.xlsm
Regarding Solar PV System Selection
NC-v4 EAc5:Renewable energy productionposted by Mamun Ferdaus on
Hi,
Receptacle Control Information documentation for ASHRAE 90.1-2010
CI-v4 EAp2:Minimum energy performanceposted by Brightworks Sustainability on
My project team received this comment and we are not sure how to address it. We have submitted a number of LEED-CI v4 projects and have never received this comment.
Renewables outside LPB & owned by Project - Campus or no Campus?
NC-v4 EAc5:Renewable energy productionposted by Anne Caminade on
Hi, We have a new small building on a large industrial site in Switzerland (same owner for the entire site) that we want to certify with LEED Gold (only the new small building) and we have no space
INNOVATION - PILOT CREDIT - Cooling tower water management
NC-v4 INc1:Innovationposted by Maria Peralta on
Hello,
Im wondering about this possible pilot credit.
ASHRAE Office Occupancy Schedule & Fan Control
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi
Option 2-Strategy A: Spotlights on a light rail
NC-v4 EQc6:Interior lightingposted by Timothy Ian Middleton on
We have an office project pursuing option 2. Our design is mainly downlighting and spotlights on a lighting rail system.
Distribution of preferred parking on mixed-used buildings
NC-v4 LTc8:Green vehiclesposted by Sofia Barahona on
Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial.
VOC Level during and Post Construction
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jalal Avades on
On our project, the Sealant VOC level is higher than the allowed limits and according to the manufacturer, that product curing is less than two week and the VOC level drops below the allowed limits