Forum quick links
Whole-Building Life-Cycle Assessment - Assessment Tools
NC-v4 MRc1:Building life-cycle impact reductionposted by Ricardo Filho on
Hi All,
I am trying to prep a presentation outlining some of the tools available to perform the "Whole-Building Life-Cycle Assessment" that are used in LEED.
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sherman Aronson on
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?
SCAQMD Exempt Compounds
CI-v4.1 EQc2:Low Emitting Materialsposted by Michelle Rosenberger on
SCAQMD Rule 1113 exempts compounds that are packaged in small containers under 1 liter. We have some sport court coatings that do not meet VOC compliance but will fall under that exemption.
Existing Fenestration in baseline model for CI projects
CI-v4 EAp2:Minimum energy performanceposted by Aravindraj RB on
Project type : LEED ID+C (CI) Version 4
Query : EA Pr. Minimum Energy Performance (Table G 3.1.5)
Density Calculation - Parking garages and roads
NC-v4 LTc4:Surrounding density and diverse usesposted by Jon Penndorf on
We are pursing LEED v4 BD+C, NC. For the Location and Transportation, Surrounding Density credit, combined density:
Local discomfort Effects
NC-v4 EQc5:Thermal comfortposted by Santiago Sánchez Sánchez on
Hi everybody,
It isn't clear to me how to document the local discomfort effects when I am under option 1 ASHRAE standard 55-2010.
LCA Inputs and Impact Measures
NC-v4 MRc1:Building life-cycle impact reductionposted by Yaya Jashri on
Hello,
The LEED V4 Guidebook said "For LEED, the project team must take into account the entire building structure and
Requirement of separate lighting control for small multi occupant spaces?
CI-v4.1 EQc6:Interior Lightingposted by Aishwarya Katta on
We have a couple of small conference rooms which fall under the category of multi-occupant spaces.
Calculation of FTE in WE calculator for project with different occupancy schedule for each floor.
NC-v4 WEp2:Indoor water use reductionposted by Sushrut Jadhav on
The project I am working on has total FTE -103 (90 Office employees + 13 Maintenance, Cleaning, and Security).