Forum quick links
Energy Model for Unconditioned Warehouse
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
We have a warehouse project located in Spain. It won`t be equipped with heating, nor cooling system. I am not sure how to approach this.
Wood donation tracking
NC-v4 MRp2:Construction and demolition waste management planningposted by Jacinta Lang on
Hi All,
Apartments in university dormitory
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Is it correct that an apartment in a dormitory should be documented as a residential dwelling unit in the MEPC on the multifamily tab but the dorm rooms should not as they are not complete dwelling
Art-center
NC-2009 IEQp1:Minimum IAQ Performanceposted by Suren Melkumyan on
Can anyone tell us about the requirements of table 6-1 and 6-4 ASHRAE regarding air exchange? Judging from what I understand Russia has more stringent regulatory requirements
Student trying to calculate FTE's for Senior Design
posted by Lauren Townley on
Good afternoon, I am trying to calculate some savings for various fixtures and I am having trouble coming up with the minutes usage for my calculations. Here is what I have so far.
CxA Experience
NC-v4 EAc1:Enhanced commissioningposted by Shuguang Huang on
Can someone with commissioning experience for LEED CI projects and LEED O+M Existing Buildings be qualifed to be commissioning agent for a new construction?
Outdoor ventilation rates in baseline and proposed
CS-v4 EAp2:Minimum energy performanceposted by Sarah Leenknegt on
Hi
Overlapping Irrigation Zones
NC-v4 WEc1:Outdoor water use reductionposted by Jennifer Wehling on
Our irrigation consultant has provided an irrigation calculation where the total irrigation area (approx. 5000 SF) is more than the total landscape SF (approx. 3000 SF).
SSc1 EBOM v4.1 - Cistern that drains collected water
EBOM-v4.1 SSc1:Rainwater Managementposted by Alexis Doyle on
Question regarding the Rainwater Management Credit (SSc1) under EBOM v4.1.