Forum quick links
feed back the survey
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Junko Miyamoto on
Hellow.
I need to complete the feedback survey for achieving the pilot credit point. Is the project information that input in the survey will be published ?
Slag Usage in LEED Projects
NC-v4.1 MRc4:Material Ingredientsposted by Brian Graf on
Hello Everyone!
Sisal 100% Natural Fiber Carpet
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Andrea Tirao on
Our project is a museum which targets IEQc4.3. One of the specified carpet for the project is 100% Sisal and we cannot find a manufacturer of Sisal with Green Label or Greenguard certification.
Stores without connection to main building
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Dear All,
Unmet hours for the proposed model
NC-v4.1 EAp2:Minimum Energy Performanceposted by Ying Lindsey on
If the baseline model meets the 300 unmet hours requirement but the proposed model does not, this may be because the design of that project has an issue. So there is no way to meet 300 unmet
Total duration for a LEED v4.1 EBOM process
posted by Eric Bautista on
Energy Star Target Finder Outside US?
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Marcus wrote this in the forum relative to CI-v4 EAp2: "Projects outside the US are not required to produce a Target Finder score".
Is that valid for BD+C as well?
Core & Shell Residential Project - Ventilation rates
CS-v4 EQp1:Minimum indoor air quality performanceposted by Agustin Bertolotti on
Hello