Log in
Forum
Topic

"No cooling tower" option removed

NC-v4.1 WEc3: Optimize Process Water Use
posted by Paula Melton on Dec 2, 2020, 9:39 am

It appears that Option 2, "No Cooling Tower," has been removed from this credit with addendum #10002465.

Last reply: Azra, Jun 14, 2023, 6:24 am

Tier 4 and Tier 5?

NC-v4.1 EAc5: Renewable energy
posted by Chris Flint Chatto on Jan 21, 2021, 1:31 pm

I see the credit description table lists tier 4 and tier 5...

Last reply: Paula Melton, Sep 14, 2022, 12:01 pm

Concrete Flooring

NC-v4.1 EQc2: Low-emitting materials
posted by Joseph Snider on Apr 13, 2021, 9:14 am

Selection forum. As far as other basic intro resources, your best source is probably the LEED intro pages on USGBC's website. Good luck! Log in or register to post comments Karl Shelton LEEDuser Basic...

Last reply: L W, Jul 2, 2024, 12:55 pm

Whole Building Meters

NC-v4 EAc3: Advanced Energy Metering
posted by Dave Hubka on Apr 15, 2021, 2:12 pm

I think whole building meters must also meet the Advanced Metering requirements per the Requirements section of the reference guide however the rest of the reference guide, credit template, and...

Last reply: Marcus Sheffer, Dec 10, 2021, 9:37 am

Office space only going for partial renovation.

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by shashank gangil on May 14, 2021, 8:30 am

We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors. Total renovated area is approximately 30% of the total...

Last reply: Edgar Arevalo, Mar 7, 2024, 12:14 am

Calculation in relation to the basic model

NC-v4.1 EAc2: Optimize Energy Performance
posted by Léanna Chérot on May 31, 2021, 3:55 am

Hello,
In the context of a project half offices and half factory New construction carried out on 3 floors, the last one will not be occupied, not heated and not ventilated. It will remain...

Last reply: Marcus Sheffer, Jun 30, 2021, 8:59 am

Preschool child toilet rooms- no urinals

NC-v4 WEp2: Indoor water use reduction
posted by Lyle Axelarris on Jul 8, 2021, 12:34 pm

I'm working on a child care center project, with many toilet rooms designed for preschool-aged children.  Since urinals are not appropriate for this occupancy type, should I consider these...

Last reply: Summer Minchew, Feb 17, 2022, 12:59 pm

LEEDv4 project that upgraded this credit to 4.1 but would like to downgrade back to LEEDv4 for this credit

NC-v4.1 MRc2: Environmental Product Declarations
posted by Summer Gorder on Oct 7, 2021, 6:31 pm

I have a LEEDv4 that has upgraded some MR credits to LEEDv4.1 that I would like to put back as LEEDv4. Can you go back once you have upgraded?

Last reply: Bipin Karki, Oct 18, 2021, 11:31 am

LEED v4 Heat Island Reduction- include elevator shafts and stairwell enclosures in roof calcs?

NC-v4 SSc5: Heat Island Reduction
posted by Julie Baines on Mar 4, 2022, 6:24 pm

Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO. However, the existing elevator and stair...

Last reply: Julie Baines, Jan 4, 2024, 1:20 pm

Strategy 7. Operable Windows- ASHRAE 62.1-2016 for windows location

NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by MAUDE PINTAL on Mar 24, 2022, 3:31 pm

Hello

As part of a residential project aimed at LEEDv4 BD+C certification, we are studying the different possibilities to meet the "Enhanced Indoor Air Quality Strategies" credit with the...

Last reply: Michael Philp, Dec 8, 2023, 8:10 pm