Topic | Recent |
---|---|
Thermal Comfort SurveyCI-2009 IEQc7.2: Thermal comfort - verificationposted by Simon Sue on May 20, 2010, 2:58 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up May 26, 2010- 5:59 pm James, there's been some good discussion on this issue over on the forum for the NC version of this credit.It's our understanding that all occupants must be surveyed or at least have an opportunity to be included.Since the survey will most likely take place after your certification is awarded, you don't have to provide the results, only commit to doing the survey. Log in or register to post comments ... Last reply: Tristan Roberts, May 26, 2010, 5:59 pm |
|
Split reviewGeneral forumsposted by Tristan Roberts on May 26, 2010, 10:58 pm
My understanding is that if you're doing a split design/construction review, if a credit is rejected at the Preliminary Construction Review, you can submit new information, perhaps even new... |
|
What does this mean for current projects under review?General forumsposted by Seema Pandya on May 4, 2010, 3:57 pm
I am happy that consistency in LEED credit rulings and interpretations will come in the future. Is there any advice for projects that are currently going through the review process that find... Last reply: Tristan Roberts, May 26, 2010, 11:35 pm |
|
P1 for Germany, Switzerland, AustriaNC-2009 SSp1: Construction Activity Pollution Preventionposted by Tatjana Ernst on May 26, 2010, 8:59 am
Hi everyone, has anybody expercience with LEED Projects in Switzerland or Austria? What challenges did you find out regarding P1? We have two projects in Vienna and Zürich. In my opinion... Last reply: Jean Marais, May 27, 2010, 3:16 am |
|
ASHRAE Compliance FormsCI-2009 EAp2: Minimum Energy Performanceposted by Jose Salinas on Apr 19, 2010, 9:49 am
Hi, my question is as follows: in version 2.2 when you chose to use the complience forms to support the mandatory provisions, only the check list part was necessary to be filled up. Since the V 3... Last reply: Paul Conrad, May 27, 2010, 8:45 am |
|
Confused on what to fill in on the ASHRAE Buiding Envelope ComplCI-2009 EAp2: Minimum Energy Performanceposted by Sarah Johnson on May 21, 2010, 2:40 pm
We are doing a LEED CI upfit in an old existing building. The upload page for EAp2 requires that we upload ASHRAE Buiding Envelope Compliance form. The Envelope is not in the scope of the... Last reply: Paul Conrad, May 27, 2010, 8:47 am |
|
Kitchen Sinks vs. "Break Room Sinks" and "Classroom Sinks"NC-2009 WEp1: Water Use Reductionposted by Kenneth Lynch on May 27, 2010, 11:42 am
In this community college office/classroom building, 40% of the flow fixtures are found in classrooms, science labs, or teacher lounges. To this point, I've never come across anyone mentioning... Last reply: Rick Gehrke, May 27, 2010, 1:33 pm |
|
Storage / Collection of Recyclables In ApartmentNC-2009 MRp1: Storage and Collection of Recyclablesposted by Jean Ascoli on May 6, 2010, 12:11 pm
Can we count space for collection of recyclables inside the dwelling units towards the SF for recyclable storage; reducing the overall size of the central storage? Last reply: Tristan Roberts, May 27, 2010, 10:22 pm |
|
Another HVAC Compliance QuestionNC-2009 EAp2: Minimum Energy Performanceposted by Omer Moltay on May 26, 2010, 2:33 pm
Dear All, Our current project is an existing building renovation, where boiler and chiller in the 2 pipe fan coil system are retained, but the fan coil units are replaced with new ones.... Last reply: Christopher Schaffner, May 28, 2010, 10:38 am |
|
LEED project boundarySchools-2009 EAc1: Optimize Energy Performanceposted by Cara Mae Cirignano on May 25, 2010, 4:14 pm2010- 1:34 pm EAp3 is pretty easy, and for a seven-year-old buliding I think you'd be fine.Why don't you post about your situation over on the IEQp3 forum? It's an interesting situation.... Last reply: Tristan Roberts, May 28, 2010, 1:34 pm |