For this credit, does the LEED team need to provide the result from this survey? Is there a requirement to survey all occupants in tenant space? LEED EBOM IEQ c2.1 states “The survey must be collected from a representative sample of building occupants making up at least 30 % of the total occupants”. Dose this statement apply to LEED CI?