Topic | Recent |
---|---|
ASHRAE 90.1 2007 Humidification systemNC-2009 EAc1: Optimize Energy Performanceposted by Ricardo Marques on Mar 5, 2012, 5:52 pm
Hi! In Ashrae 90.1 2007 appendix G, in baseline simulation, what is the system type for humidification? (If the proposed building has humidification) Many thanks Ricardo Last reply: Marcus Sheffer, Mar 7, 2012, 12:12 pm |
|
Responsible Extraction of Raw MaterialsGeneral forumsposted by Tom Lent on Mar 19, 2012, 4:42 pm
This is a very important move for LEED - expanding the scope of attention on extraction from the previous focus only on... Last reply: Tom Lent, Mar 21, 2012, 1:40 pm |
|
Option 3- Variable conditionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Maura Adams on Dec 22, 2011, 1:45 pm
I'm trying to decide whether to continue pursuing Option 3 measurements. December in the northeast is not an ideal time to be measuring daylight, even when it's sunny outside. The footcandle... Last reply: Jill Perry, PE, Jan 2, 2012, 3:49 pm |
|
Alternative Transportation Survey Results Calculator- ErrorEBOM-2009 SSc4: Alternative Commuting Transportationposted by Tyler Farmer on Jan 11, 2012, 2:41 pmI tried the other settings (Auto Except for Data Tables and Manual) and they did not resolve the error message either. I will look at some excel forums to see if I can find a solution. Thanks. Log... Last reply: Klaus Zednik, Jan 23, 2012, 10:23 am |
|
Naturally Ventilated Garment Factory for 90.1 appendix GNC-2009 EAp2: Minimum Energy Performanceposted by Kevin Sullivan on May 9, 2012, 1:11 am
We are looking to certify a garment factory in Dhaka which will not have any conventional HVAC systems. We would like to know if the following approach can be used for attempting LEED Optimize... Last reply: Kevin Sullivan, May 14, 2012, 1:42 pm |
|
LEED Online, Reference Guides, User Friendly DocumentationGeneral forumsposted by Michelle Teague on Jun 1, 2012, 12:36 pm
LEED Users, what are your thoughts and experiences with LEED Documentation? Last reply: Marcus Sheffer, Jun 1, 2012, 2:55 pm |
|
Non-certifiable building within LEED campus boundaryLEED Guidance for Campuses and Multiple Buildingsposted by Marcio Alberto Casado Pereira on Sep 13, 2012, 1:39 pm
We have a campus composed of 5 buildings where one of them (P40) does not meet MPR 4: minimum floor area requirement of 1000sqft. All 5 buldings are within the property line, which we were... Last reply: Louise Schlatter, Feb 5, 2013, 4:49 pm |
|
TVOC LimitNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by matthew convery on Sep 19, 2012, 2:19 pm
I am trying to determine if the... Last reply: Phillip Cook, Aug 13, 2013, 11:00 pm |
|
Grass only, no irrigationNC-2009 WEc1: Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on Sep 25, 2012, 3:53 pm
Hello Our client is using only grass in the landscaping and this is not going to be irrigated. Are we elegible for credit WEc1? Last reply: Susann Geithner, Dec 6, 2012, 9:29 am |
|
Return fan for baseline modelNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Nov 16, 2012, 12:24 pm
Par. G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall also be modeled with fans serving the same functions and sized for the... Last reply: Marcus Sheffer, Nov 20, 2012, 2:05 pm |