Forum quick links
Project pertaining to only the third floor of a building
CI-v4 EAc2:Optimize energy performanceposted by Peter Downar on
- The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
Free fresh air provided to small rooms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dina El-Sady on
I am working on a project with many small buildings connected to each other , some of the very small rooms may be designed with free fresh air entering through fresh air grilles not fans , is
Low-emitting Material Calculator
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
The Low-emitting Material Calculator includes, VOC emissions criteria in the instructions for a Hong Kong Pollution Controls, and Canadian VOC Limitations regulations, are those only for projects i
Greenguard for plywood
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erin Holdenried on
IS Greenguard certification plus an attestation from the manufacturer that there is no formaldehyde acceptable for plywood products?
Flooring materials applied in the lift car
CS-v4 EQc2:Low emitting materialsposted by Ray Chan on
My project intends to apply sealant and sheet vinyl as the flooring materials in the lift car. Please advise whether the mentioned materials can be exempted from EQ2.
"Average" cost of conducting an LCA
posted by Andrée Iffrig on
Hi SD Leaders, my firm wants to make a case for conducting LCAs on all major projects.
Hotel rooms requirements
Hospitality-NC-v4.1 EQc9:Acoustic Performanceposted by Fábia Leal on
Hi!
In the new LEED v4.1 i noticed that in the acoustic performance credit all reference to residential projects has been removed.