Forum quick links
Rating system for shopping malls
posted by Jefferson Au-Yeung on
Hi, I am working on a shopping mall project, and our client is doing alteration & addition works to an existing building.
EQp2
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Alice Andersen on
Hi LEEDuser
I have two questions:
Anti-Ligature Plumbing Fixtures
Healthcare-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Hello, has anyone had an success getting an exemption or exclusion on the WaterSense requirements for anti-liguature fixtures in an in-patient mental health facility?
"ready for review" status in Design Final Review Decision
CS-2009 IDc2:LEED Accredited Professionalposted by sofia la cognata on
Good Morning,
Zone Isolation in Hotels
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Biophilic Design: Quantifiable Metrics
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by LEED Team DC on
Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics.
Exemplary Performance
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Peter Downar on
The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic
Requirement for sequence of operations for systems not part of a BAS?
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Stephen Ward on
Are we required to submit a sequence of operations for HVAC systems that are not part of the building's automation system?
sDA calculations for 100 Lux
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Alexandre DENEUVILLE on
Hello,