INPc136_Daily Journals

CS-2009 IDc1: Innovation in Design
posted by Juan Guerrero on Sep 15, 2021, 12:05 pm

Hi everyone, I have a question from the credit Safet First: Re-Enter Your Workspace.

For the Daily Journal Management and Daily Journal Occupants documents, do we need to fill the sheets...

Electric Charging Stations out of Leed Boundary

NC-v4 LTc8: Green vehicles
posted by Jorge Lopez de Obeso on Sep 3, 2021, 3:15 pm

Hi !

Leed v4:

Is it possible to have electric charging station out of the Leed Boundary ?  This secundary parking lot, where the charging stations are, provides service to the whole...

Last reply: Afogreen Build, Sep 13, 2021, 2:58 am

MERV 11

NC-v4 EQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 17, 2017, 12:48 pm

Hallo,

In an office building located in Mexico City (a location with a high PM2.5 and ozone levels), the floors are served by AHU’s equipped with...

Last reply: Olman Joaquin Ledezma Unzueta, May 11, 2021, 10:54 am

Strategies

Pilot-Credits SSpc55: Bird collision deterrence
posted by Carolina Vasquez on Jun 4, 2020, 1:00 pm

Hi, 

We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like...

Last reply: Michelle Cordero, Apr 28, 2021, 12:43 pm

Documentation Option 1

Pilot-Credits IPpc89: Social equity within the community
posted by Carolina Martinez on Aug 17, 2020, 2:54 pm

Our project finished SEED evaluator parts 1 and 2, the only mail we received from them is a blank mail indicating that the project is approved to move forward to part 3. Is this email enough as...

Biodigestion process instead of composting

ND-Plan-v4 GIBc16: Solid waste management
posted by LEED Pro Consultant on Jul 27, 2020, 10:58 am

We are trying to achieve the GIB - Solid Waste Management.

The project will have recycling stations, a drop-off point for hazardous waste, and recycling containers every 245m. ...

Last reply: Eliot Allen, Jul 27, 2020, 11:53 am

Full Occupancy Calculations

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Giovani Bernal on Jun 1, 2020, 11:58 pm

Our project is a 24 level office building. At least 75% of occupancy has been reached.

According to LEED Compliance Guide, for EQ Prerequisite Minimum Indoor Air Quality Performance, for...

Last reply: Patrick Murisset, Jun 16, 2020, 3:15 pm

Retail Terrace

EBOM-v4 SSc4: Light Pollution Reduction
posted by Jorge Lopez de Obeso on Apr 22, 2019, 3:07 pm

Hello everyone, We are working on a project attempting option 2: Perimeter measurements. 

How should exterior lighting in terraces from retail should be addressed? specifically in this...

Last reply: Bill Swanson, May 8, 2020, 9:27 am

Individual Thermal Comfort Controls- Open office

CI-v4 EQc5: Thermal comfort
posted by Mariana del Valle on Apr 23, 2020, 10:52 pm

  Hi!

Is there a different alternative to providing individual thermal comfort controls for each workstation in open areas? assuming that the HVAC design is divided by thermal zones, so it...

Last reply: Tyler Thumma, Apr 30, 2020, 1:12 pm

Surface Reflectance Furnishings scope

CI-v4 EQc6: Interior lighting
posted by Mariana del Valle on Apr 23, 2020, 10:11 pm

Hi,

I would like to know if the definition of "work surfaces" includes only the surfaces of the workstations, or if it also includes any other surface such as: cassuals...