Topic | Recent |
---|---|
EnergyStar- product categories to be included in the calculationsCI-v4 EAp2: Minimum Energy Performanceposted by Agata Mozer on Mar 21, 2022, 9:44 am
Hi All, This prerequisite says: "Install ENERGY STAR appliances, office equipment, electronics, and commercial food service equipment (HVAC, lighting, and building envelope products are... Last reply: Marcus Sheffer, Mar 21, 2022, 11:49 am |
|
Cloths dryerCI-v4 WEp1: Indoor water use reductionposted by Agata Mozer on Mar 8, 2022, 9:50 am
Can anyone confirm if cloths dryers have to be EnergyStar certified as well or is this requirement only for cloths washers? Last reply: emily reese moody, Mar 8, 2022, 11:39 am |
|
OA Flow to enter in MEPCCS-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jan 17, 2022, 5:20 am
Greetings, We are facing the following issue, for which we’d need some assistance/advice. The project design (Proposed model) iis structured mainly on VRF systems. At the same time... Last reply: Tyler Thumma, Feb 17, 2022, 10:03 am |
|
Pilot Credit INpc155NC-v4 EQp1: Minimum indoor air quality performanceposted by Vassil Vassilev on Jan 26, 2022, 2:27 am
Greetings, In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared: In case our project has no recirqulation, meaning it... |
|
3. Lighting ControlCI-v4.1 EQc6: Interior lightingposted by Agata Mozer on Jan 18, 2022, 4:36 am
Hi All, I have a question regarding strategy 3. Lighting control. The guide states that we have to "Provide dimmable or multilevel lighting for 90% of occupant spaces." Does it mean that in open... |
|
Core and Shell area and Tenants areaCS-2009 EAc6: Green Powerposted by Vassil Vassilev on Nov 30, 2021, 11:02 am
Greetings, Pursuing EAc6, Option 1, for office building registered as C&S for LEED certification, the following issue is kind of not clear to me: Normally, when a building type... Last reply: Marcus Sheffer, Dec 2, 2021, 10:19 am |
|
Pilot-Credits EQpc124 as prerequisitePilot-Credits EQpc124: Performance-based indoor air quality design and assessmentposted by Zuzanna Targosz on Oct 19, 2021, 6:25 am
We would like to pursue this Pilot Credit as ventilation prerequisite for a project located in Russia. Should we submit all documentation as Pilot in Innovation credit or in the prerequisite... Last reply: Garrett Ferguson, Oct 21, 2021, 3:43 pm |
|
Rainfall Events calculatorCS-v4 SSc4: Rainwater managementposted by Simona Kabadova on Oct 20, 2021, 5:11 am
The project is situated in Sofia, Bulgaria. From the our National Institute of Meteorology and Hydrology we have historical data for daily precipitation only for two years - 2020 and 2021. As I... |
|
Process water use- total building regulated water use definitionNC-v4.1 WEc3: Optimize Process Water Useposted by Zsuzsanna Gidro on Sep 28, 2021, 10:01 am
Hi! It is unclear to me what does the total building regulated water use means in this case. Is this equal to the indoor water use (plumbing fixtures use) calculated in the prerequisite?... |
|
LEED V3 EAp2 Minimum Energy Performance: Exterior Lighting power prerequisiteNC-2009 EAp2: Minimum Energy Performanceposted by Tomasz Kolsicki on Jul 23, 2021, 5:41 am
Hello, I am currently answering review comments from certification unit for C&S office buiilding. We are struggling with exterior lighting issue, because proposed external lighting... Last reply: Marcus Sheffer, Aug 3, 2021, 9:50 am |