Log in
Forum » Europe – Eastern
Topic

LEED v4 NC / OM- horizontally attached addtition to existing building

LEED Rating System Selection
posted by Dávid Jakab on Jun 14, 2022, 3:34 am

Hello Everyone,

I am preparing a project, which is going to be a newly constructed addition (horizontally) to an existing building. The existing building's function is warehouse/retail/...

Last reply: Dávid Jakab, Jun 28, 2022, 1:41 am

Registration to Pilot-Credit INpc155

Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Control
posted by Vassil Vassilev on May 12, 2022, 2:40 am

Greetings,

There is a problem when attempting for a Registration to this Pilot-Credit.

It is as follows: When pressing the option Register for the Pilot Credit, for the Select...

Last reply: Kristina K, May 12, 2022, 8:46 am

LEED v4 ID+C_EA energy modeling

CI-v4 EAc2: Optimize Energy Performance
posted by Dávid Jakab on Apr 20, 2022, 2:34 am

Hello LEED experts,

Do you have any common practice regarding the energy modeling in EA (PR and CR)?

I am wondering if it is enough to make an energy modeling simulation for the...

Last reply: Marcus Sheffer, Apr 22, 2022, 8:56 am

EnergyStar- product categories to be included in the calculations

CI-v4 EAp2: Minimum Energy Performance
posted by Agata Mozer on Mar 21, 2022, 9:44 am

Hi All,

This prerequisite says: "Install ENERGY STAR appliances, office equipment, electronics, and commercial food service equipment (HVAC, lighting, and building envelope products are...

Last reply: Marcus Sheffer, Mar 21, 2022, 11:49 am

Cloths dryer

CI-v4 WEp1: Indoor water use reduction
posted by Agata Mozer on Mar 8, 2022, 9:50 am

Can anyone confirm if cloths dryers have to be EnergyStar certified as well or is this requirement only for cloths washers?

Last reply: emily reese moody, Mar 8, 2022, 11:39 am

OA Flow to enter in MEPC

CS-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Jan 17, 2022, 5:20 am

Greetings,

We are facing the following issue, for which we’d need some assistance/advice.

The project design (Proposed model) iis structured mainly on VRF systems. At the same time...

Last reply: Tyler Thumma, Feb 17, 2022, 10:03 am

Pilot Credit INpc155

NC-v4 EQp1: Minimum indoor air quality performance
posted by Vassil Vassilev on Jan 26, 2022, 2:27 am

Greetings,

In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared:

In case our project has no recirqulation, meaning it...

3. Lighting Control

CI-v4.1 EQc6: Interior lighting
posted by Agata Mozer on Jan 18, 2022, 4:36 am

Hi All, I have a question regarding strategy 3. Lighting control. The guide states that we have to "Provide dimmable or multilevel lighting for 90% of occupant spaces." Does it mean that in open...

Core and Shell area and Tenants area

CS-2009 EAc6: Green Power
posted by Vassil Vassilev on Nov 30, 2021, 11:02 am

Greetings,

Pursuing EAc6, Option 1, for office building registered as C&S for LEED certification, the following issue is kind of not clear to me:

Normally, when a building type...

Last reply: Marcus Sheffer, Dec 2, 2021, 10:19 am

Pilot-Credits EQpc124 as prerequisite

Pilot-Credits EQpc124: Performance-based indoor air quality design and assessment
posted by Zuzanna Targosz on Oct 19, 2021, 6:25 am

We would like to pursue this Pilot Credit as ventilation prerequisite for a project located in Russia. Should we submit all documentation as Pilot in Innovation credit or in the prerequisite...

Last reply: Garrett Ferguson, Oct 21, 2021, 3:43 pm