Tennis Court use for meeting SSc5.2 Maximize Open Space

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  JOHN COOK  on 

Can we count count our Tennis courts - that are part of the project boundary towards our Space requirement in Case 2? The courts are hardscaped.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Dec 19, 2011, 8:17 pm

Glass partition system with aluminium frames

CI-2009 MRc4:Recycled Content
posted by  Yong Lee Low  on 

We are using an interior partition system which includes aluminium frames and glass partitions.The aluminium frames have recycled content but according to the CSI masterformat list do we need to in

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 19, 2011, 7:15 pm

Permeable pedestrian sidewalk

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  MARCIO OROFINO  on 

Would anyone inform if permeable pedestrian sidewalk on the ground, recharging groundwater, may be counted towards the achievement of the restored área and ecollogic site feature? Tks

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 19, 2011, 6:52 pm

Repair Bays

NC-2009 IEQc2:Increased Ventilation
posted by  Esperanza Adams  on 

Repair bay do not have Ventilation requirement but they do have exhaust requirement. Per the increased ventilation credit would we have to exhaust 30% more outside air?

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Mon Dec 19, 2011, 4:34 pm

Parking Islands

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Zachary Guren  on 

Has anyone successfully used parking lot islands planted with native vegetation to contribute toward this credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 19, 2011, 1:51 pm

What is the correct way to find the width of the street?

Pilot-Credits PC14:Walkable Streets
posted by  Grace Heicher  on 

The credit requirements do not seem to be consistent in defining the street width.

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Mon Dec 19, 2011, 12:11 pm

Components to be included in the calculations for MRc5

CI-2009 MRc5:Regional Materials
posted by  Diana Nezamutinova  on 

Should lighting be included in the calculations? It is neither a Division 12 component, nor a construction material.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 19, 2011, 8:58 am

Green Cleaning Policies

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Wendy Lao  on 

Are there any examples of GC policies that could be shared?

3
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Mon Dec 19, 2011, 5:35 am

Silicone sealant for glass block installation

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Adi Negara, LEED AP BD+C  on 

Dear all, Does the silicone sealant used for the glass block installation need to comply with the maximum VOC requirements of this credit?

5
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Sun Dec 18, 2011, 5:59 am
2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Sun Dec 18, 2011, 5:52 am