Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Level of detail needed in ESC?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Patty Breech  on 

This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 29, 2012, 6:13 pm

pursuing more credits after the performance period.

Performance Period
posted by  Jim Park  on 

I am working on one EB project and it needs of more points to achieve a desired rating.

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Feb 29, 2012, 12:02 am

District Cooling for Humidity Control

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).

3
Tue Feb 28, 2012, 9:51 pm

Private vs Public Fixtures

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Garrett Billings  on 

I am submitting a LEED CI project in a multi-tenant building and would like to get the points.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 28, 2012, 7:31 pm

Hotel project with multiple buildings

LEED Guidance for Campuses and Multiple Buildings
posted by  Wei Jiang  on 

We are working on a resort project with multiple small buildings each with 2~3 stories. The main building house hotel public and function areas including ballroom, restaurants, ect.

7
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Tue Feb 28, 2012, 3:38 pm

Fuel for district energy and electricity

NC-2009 MRc2:Construction Waste Management
posted by  Tanja Arnesson  on 

Hi, I'm working in Sweden with LEED where we have a different district energy system (very effective and 84% (50% of the people living in Sweden) of the multifamily residents get their heat and ho

8
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Mon Feb 27, 2012, 4:18 pm

To include microwaves?

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Simon Ng  on 

Dear All, We are trying to pursue EAc1.4 for our current library proposal.

3
Default Avatar
LEEDuser Basic Member
8 thumbs up
Mon Feb 27, 2012, 2:34 pm

A Learning Center to Support Farming on Prime Farm Land

NC-2009 SSc1:Site Selection
posted by  Brooks Critchfield  on 

We have a project in a rural area sited on an existing farm.

3
Sun Feb 26, 2012, 11:06 pm

LEED boundary question

NC-2009 SSc1:Site Selection
posted by  Mark Meaders  on 

I am working on a project that is being completed in 2 phases. Phase 1 is completed and a certified LEED project.

3
Sustainable Principal
HDR, Inc.
LEEDuser Expert
72 thumbs up
Sun Feb 26, 2012, 10:42 pm

ASHRAE 90.1-Envelope Fenestration & Skylight Fenestration area

NC-2009 EAp2:Minimum Energy Performance
posted by  Natalie Tan  on 

Hi, We have a new 400m2 dining hall project in Climate zone 1, and would like to seek advice on the compliance for having to meet the maximum 40% for vertical fenestration area as well as not excee

3
Fri Feb 24, 2012, 11:16 pm