Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tennant HVAC System Unknown

CS-2009 EAc1:Optimize Energy Performance
posted by  Marco Marco  on 

Hi all, I am working on a whole building simulation according to Appendix G. The 10 storey building is divided on 3 tennants.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 13, 2012, 6:42 pm

SSc8 vertical grid points

General forums
posted by  Bill Swanson  on 

Some commentors are stating that regarding SSc8, Reviewers are asking for vertical calculation points spaced 5' apart.

2
Director of LEED Support
U.S. Green Building Council
LEEDuser Premium Member
25 thumbs up
Fri Apr 13, 2012, 5:44 pm

CS project: How do I know the regularly occupied spaces?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Susan M. Kaplan  on 

Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 13, 2012, 12:26 pm

How to count interior structural walls

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Alessio Zampaglione  on 

I found a contrasting information about how to count the interior structural wall.

8
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Fri Apr 13, 2012, 12:04 pm

Articulated Buses

posted by  Cesar Ruiz  on 
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 12, 2012, 5:11 pm

Cost of Certification

Understanding the Cost of LEED-NC Project Certification
posted by  Andrew Gil  on 
Hello Tristan, Others, I have been reading & tracking as closely as possible the discussions regarding the "cost of LEED" since 2001 and have always been disappointed in the ubiquitous avoidance
2
Default Avatar
Sustainable Cost Solutions LLC
LEEDuser Premium Member
195 thumbs up
Thu Apr 12, 2012, 5:06 pm

Would permanent and attached seating count in roof calculations?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maria Fiorelli  on 

I have a roof of a building which has a light colored concrete surface and should in theory meet the requirements of the credit.

3
Default Avatar
Lorax Partnerships, LLC
LEEDuser Basic Member
6 thumbs up
Thu Apr 12, 2012, 1:15 pm
3
Thu Apr 12, 2012, 5:56 am

Absorption chiller in baseline model

NC-2009 EAp2:Minimum Energy Performance
posted by  Jens Apel  on 

Dear all, Sorry in advance for this lengthy thread. In a current (European) project the certifying building will be supplied with district heat from a large city network.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 12, 2012, 5:27 am

Social meeting residential building terrace FTE/visitors calc.

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nadia Ayala  on 

Hi everyone, I have a project (residential building) that has a roof terrace with self-service amenities such as kitchenette, chimney, lounge areas, etc.

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Apr 12, 2012, 1:49 am