Forum quick links
Building providing electricity to offsite construction project
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Patrick Culhane on
An office building that my organization manages and that we are considering for certification has been (and will continue to for at least a year) provide electricity to a construction project locat
Deciphering the Reference Manual SCAQMD table
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andrew Gil on
We've been pursuing LEED certification for projects under every LEED Rating system version since LEEDv2.1, but none of us here can make heads or tails of the SCAQMD table in the v.2009 Ref Manual:
Interior vapor barrier- VOC limits?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Joel Register on
I'm trying to determine the applicable VOC limit for an interior liquid-applied vapor barrier product, to be used on interior block walls surrounding an interior swimming pool.
3 types of glass in the proposed design
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
In the building we are modeling 3 tyes pf glass (3 different U values and SC) are used by the architect.Is it acceptable for EAP2 that I do the following: 1-Use % or glass on each elevation provid
Service in opposite directions
Pilot-Credits PC12:Reduced Automobile Dependenceposted by AMY VAN DAM on
The second bulleted requirement of Option 1 “Trips are counted only if they are a part of a route with service in opposite directions” is slightly unclear.
Energy STAR Qualified Equipment for a Grocery Store?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Kory Beighle on
I am working on the LEED documentation on a grocery store project and we are more towards the beginning of the project still.
POS system
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Eddy Tsang on
Does anyone have the experince in retail project ?
fit out work
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
Part of my project is considered as fit out which means that there are some office floors where the area is divided into offices and to each office a chilled water tap point is provided is air cond
Retail Displays and Fixtures
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Kathy Mann on
I am a newbie to this forum and am working on my first LEED accreditted project so please bear with me if I ask a few remedial questions!
IEQp1: ASHRAE 62.1 vs Local Code
NC-2009 IEQp1:Minimum IAQ Performanceposted by Caitlin Levitsky on
Some states and major metropolitan areas have their own local codes.